MEC02-00725
| Pressure Test | 3/15/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | A | FAIL |
|
|
wasted time tring to find pt that doesn't exist, contractor didn't call for cancellation 3/18/2002 10:40:28 AM
|
MEC02-00436
| Pressure Test | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | A | FAIL |
|
|
pressure test failed, corrections made at piping 3/18/2002 9:39:14 AM
|
MEC01-00224
| Final | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | DONE |
|
|
already final 3/18/2002 2:16:24 PM
|
MEC02-00754
| Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | FAIL |
|
|
no answer 3/18/2002 2:06:17 PM
|
MEC01-03498
| Final | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | PASS |
|
|
fn randy ###-####
|
MEC02-00436
| Pressure Test | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 350 On 3/18/2002 9:38:41 AM
|
MEC02-00706
| Final | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | PASS |
|
|
###-#### butler ###-#### carlos
|
MEC02-00724
| Final | 3/18/2002 | 3/18/2002 | 3/18/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 10:03:30. Contact: ###-####.
|