Inspections for the day of: Monday, March 18, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00492 BLD-Foundation3/14/20023/18/20023/18/2002 12:00:00 AMAPART
###-#### BILL
BLD00-03236 BLD-Final3/15/20023/18/20023/18/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/15/2002 at 12:32:20. Contact: ###-####.
BLD02-00394 BLD-Footing3/15/20023/18/20023/18/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/15/2002 at 12:52:11. Contact: ###-####.
BLD01-03065 BLD-Final3/15/20023/18/20023/18/2002 12:00:00 AMANH
###-#### call first for access. Called number no answer back. sol i called it back in. 3/18/2002 12:07:32 PM
BLD99-00444 BLD-Conference3/18/20023/18/20023/18/2002 12:00:00 AMPPART
###-#### or ###-#### Pat call to meet
BLD02-00318 BLD-Framing/Rough-in3/18/20023/18/20023/18/2002 12:00:00 AMPPART
###-#### tony . east and north walls complete. 3/18/2002 5:17:41 PM
BLD00-03236 BLD-Final3/18/20023/18/20023/18/2002 12:00:00 AMPCANC
Scheduled by Inspector: 407 On 3/18/2002 11:30:52 AM Call ###-#### for access. 3/18/2002 11:34:45 AM.NOT the right permit I added in wrong number. 3/18/2002 12:19:52 PM
BLD01-00736 BLD-Framing/Rough-in3/18/20023/18/20023/18/2002 12:00:00 AMPPART
CLAY ###-#### Still need beam in kitchen with holes approved. also top of wall connection at lower floor 2 locations done. 3/19/2002 9:58:59 AM
BLD01-00729 BLD-Framing/Rough-in3/18/20023/18/20023/18/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 3/18/2002 12:11:40 PM beam in kitchen with holes needs approval also need the top of wall connections completed at the 2 1st floor shear walls. 3/19/2002 10:00:09 AM
BLD01-00737 BLD-Framing/Rough-in3/18/20023/18/20023/18/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 3/18/2002 12:12:01 PM