FIR04-00021
| INSP-Final Inspection | 3/12/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
Resubmit fire alarm plans that include all devices including the second dry pipe valve, backflow preventor and the additional three duct smoke detectors. End of line voltage on the notification circuits exceeds 21.6 volts(nfpa 72, 7.3.2.3). Provide verification/explanation on resubmittals on why remaining hvac units do not have automatic shutdown per IMC. Office and corridor areas that open into the new addition must be brought up to code compliance. Only the items listed above have been inspected and addressed. All other items to be verified when resubmitted plans have been issued 3/18/2004 9:41:04 AM
|
FIR04-00060
| INSP-Final Inspection | 3/16/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
need shell system finaled. Everything else is ok 3/18/2004 9:48:55 AM
|
FIR04-00094
| INSP-Final Inspection | 3/16/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
Ok to final when shell is done 3/18/2004 9:53:40 AM
|
FIR04-00104
| INSP-Alarm Testing | 3/16/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
a/v's to comply with note #3. Provide additional duct smoke detectors on hvac units in the mark monitor space. Provide sample tubes for duct smoke detectors. Test remaining duct smoke detectors. Provide fax of signals. 3/18/2004 9:51:29 AM 3/18/2004 9:51:45 AM
|
FIR04-00084
| INSP-Final Inspection | 3/16/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | PASS |
|
|
fire sprinklers finaled 3/18/2004 1:16:55 PM
|
BLD02-00699
| FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
Paint curbing and final sprinklers and alarms 3/18/2004 9:52:42 AM
|
BLD04-00041
| FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
Ok to final when shell is done 3/18/2004 9:54:57 AM
|
BLD04-00042
| FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
Ok to final when shell has been done 3/18/2004 9:54:29 AM
|
BLD03-01797
| FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | CANC |
|
|
Did not due life safety since fire alarm failed 3/18/2004 9:41:32 AM
|
BLD03-01356
| FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
Provide fire sprinkler protection in the gas closet per the review notes. Provide verification that the exhaust tubes on the duct smoke detectors can have inlet holes as the installation instructions do not shown this 3/18/2004 10:34:13 AM
|
BLD03-03046
| FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | FAIL |
|
|
Provide suite number per review note #2. Provide approved door hardware on the exterior door of office 102. Door hardware on the main entry exit is mounted backwards and won't allow exiting. Provide fire extinguisher with current inspection tag and mounted 48" above finish floor. 3/18/2004 11:45:18 AM
|
BLD03-02216
| FIRE-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | A | PASS |
|
|
fire life safety finaled. Hvac unit did not require automatic shutdown 3/18/2004 11:07:08 AM
|
FIR04-00088
| INSP-Final Inspection | 3/17/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | P | FAIL |
|
|
Upright sprinkler heads in the warehouse along the wall the runs north/south are overspaced off of the wall. Plans show the uprights there but their not. All of the ceiling tile was in so i could not verify pipe and hangers above the offices. Existing trapeze hangers don't conform to review note #32 and the earth quake bracing is attached to the bottom chord of the trusses. See review note #34. 3/18/2004 3:35:38 PM
|
FIR02-00347
| INSP-Final Inspection | 3/18/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | P | CANC |
|
|
forward flush
|
MIS04-00086
| FIR-Final | 3/16/2004 | 3/18/2004 | 3/18/2004 12:00:00 AM | P | PASS |
|
|
life safety finaled 3/18/2004 1:56:09 PM
|