Inspections for the day of: Friday, March 18, 2005.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-00052 Final3/18/20053/18/20053/18/2005 3:37:15 PMPFAIL
LAURA ZANE; Phone #: ###-#### Internet Inspection Request from: Mya Matheson no access to insp.
MEC05-00854 Final3/17/20053/18/20053/18/2005 3:24:02 PMPPASS
Pressure test only. Please inspect as early as possible in the afternoon. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
BLD04-02921 BLD-Framing/Rough-in3/18/20053/18/20053/18/2005 3:02:46 PMPPASS
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore fire blk unusable space/lvl to bearing over window.
BLD04-02958 BLD-Framing/Rough-in3/17/20053/18/20053/18/2005 2:32:34 PMAPASS
david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD04-02886 BLD-Wall cover3/18/20053/18/20053/18/2005 1:38:55 PMPPASS
Scheduled by a contractor via Hello! on 3/18/2005 at 8:41:05 AM. Contact: ###-####.ok pending mech aproval
BLD05-00616 BLD-Foundation3/17/20053/18/20053/18/2005 11:46:10 AMAPASS
Scheduled by a contractor via Hello! on 3/17/2005 at 9:00:21 PM. Contact: ###-####.
BLD04-02721 BLD-Framing/Rough-in3/16/20053/18/20053/18/2005 11:35:40 AMPPASS
Scheduled by a contractor via Hello! on 3/16/2005 at 8:42:15 AM. Contact: ###-####. 1.5 at exit door to be checket at final /ec ok
BLD04-02594 BLD-Final3/18/20053/18/20053/18/2005 11:21:00 AMAFAIL
Scheduled by a contractor via Hello! on 3/18/2005 at 7:06:23 AM. Contact: ###-#### need plm final..
BLD04-02596 BLD-Final3/18/20053/18/20053/18/2005 11:20:28 AMAPASS
Scheduled by a contractor via Hello! on 3/18/2005 at 7:05:34 AM. Contact: ###-####.
BLD05-00211 BLD-Energy code compliance3/18/20053/18/20053/18/2005 10:56:48 AMAPASS
Scheduled by a contractor via Hello! on 3/18/2005 at 6:30:12 AM.
BLD04-02752 BLD-Final3/18/20053/18/20053/18/2005 10:27:56 AMAPASS
Scheduled by a contractor via Hello! on 3/18/2005 at 7:04:32 AM. Contact: ###-####.
BLD05-00376 BLD-Foundation3/18/20053/18/20053/18/2005 10:10:51 AMAPASS
Scheduled by a contractor via Hello! on 3/18/2005 at 7:24:31 AM. Contact: ###-####.
BLD04-02752 DOC - Permit Finaled3/18/20053/18/20053/18/2005 12:00:00 AMAPASS
BLD04-02596 DOC - Permit Finaled3/18/20053/18/20053/18/2005 12:00:00 AMAPASS