PLM03-01496
| Final | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | | PASS |
|
|
for restroom and mechanical room rough-in ,s only no fixture,s installed under this permit 3/18/2005 3:00:15 PM
|
PLM03-02524
| Plumbing Rough-in | 3/14/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | A | FAIL |
|
|
barry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to change piping to trap arm for lav 2- change 3x2 san tee in crawl to approved directional fitting 3- add clean out on 2inch drain to washer need to add some additional hanger,s on abs drain lines home owner to recall when ready 3/18/2005 11:10:59 AM
|
PLM05-00755
| Sprinkler (Final) | 3/17/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | A | PASS |
|
|
###-#### - bill
|
PLM05-00718
| Water and/or Sewer | 3/17/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | A | PART |
|
|
I WILL CALL WITH A TIME WHEN I KNOW; Phone #: ###-#### Internet Inspection Request from: RENEE CORNWALL 1- need to raise pvb 12 inches above all down stream piping as per table 6-2 upc 2003 2- need pvb tested and certified note - piping from meter to building ok ok to cover callled plumbing contractor and left correction notice on job site at meter base 3/18/2005 10:08:19 AM
|
PLM05-00749
| Plumbing Rough-in | 3/17/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | A | PART |
|
|
###-#### brian seafood and meat area and existing restroom area ok 3/18/2005 11:11:57 AM
|
PLM05-00770
| Water and/or Sewer | 3/17/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | A | PASS |
|
|
RANDALL ###-####
|
PLM05-00551
| Plumbing Rough-in | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/18/2005 at 7:24:54 AM. Contact: ###-####.
|
PLM05-00545
| Plumbing Rough-in | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/18/2005 at 7:25:47 AM. Contact: ###-####.
|
PLM05-00211
| Final | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PART |
|
|
side door to garage will be open Internet Inspection Request from: Christine Cooper need to have double check backflow preventer installed on hot and cold water supply lines to pedicure spa and have tested and certified for final inspection 3/18/2005 2:10:55 PM
|
PLM05-00771
| Plumbing Rough-in | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PASS |
|
|
Shayne is contact at job ###-#### Internet Inspection Request from: Roger Patterson
|
PLM05-00782
| Plumbing Rough-in | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PASS |
|
|
FOREMAN ROGER ELAM; Phone #: ###-#### Internet Inspection Request from: Jen Pudelko
|
PLM05-00789
| Water and/or Sewer | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | NR |
|
|
danny ###-#### not ready 3/18/2005 2:11:51 PM
|
PLM05-00790
| Water and/or Sewer | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | NR |
|
|
danny ###-####not ready 3/18/2005 2:12:02 PM
|
PLM05-00791
| Water and/or Sewer | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PASS |
|
|
jake ###-#### swr turnaround inside the building
|
PLM04-01581
| Final | 3/18/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PASS |
|
|
randy - ###-#### (doug owner); Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PLM05-00769
| Water and/or Sewer | 3/17/2005 | 3/18/2005 | 3/18/2005 12:00:00 AM | P | PASS |
|
|
###-#### - steve
|