PLM07-03223
| Final | 3/18/2008 | 3/18/2008 | 3/18/2008 4:54:15 PM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon units 403,404,405,503,504, and 507 needs 1" airgap on T&P and dcva installed on garbage chute wash.............ds
|
PLM08-00550
| Sprinkler (Final) | 3/18/2008 | 3/18/2008 | 3/18/2008 4:51:30 PM | P | NR |
|
|
charles Phone #: ###-#### needs dcva tested.......ds
|
PLM08-00253
| Final | 3/17/2008 | 3/18/2008 | 3/18/2008 3:21:46 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/17/2008 at 5:18:00 PM. Contact: ###-####.
|
PLM06-02096
| Final | 3/18/2008 | 3/18/2008 | 3/18/2008 3:21:24 PM | P | PASS |
|
|
JIm; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
PLM08-00549
| Plumbing Rough-in | 3/18/2008 | 3/18/2008 | 3/18/2008 3:12:42 PM | P | NR |
|
|
scott Phone #: ###-####
|
PLM07-03885
| Final | 3/18/2008 | 3/18/2008 | 3/18/2008 3:10:48 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 3/18/2008 at 7:56:34 AM. Contact: ###-####.
|
PLM08-00550
| Water and/or Sewer | 3/18/2008 | 3/18/2008 | 3/18/2008 2:12:56 PM | P | PASS |
|
|
charles\\water line Phone #: ###-####
|
MIS08-00047
| PLM-Conference | 3/17/2008 | 3/18/2008 | 3/18/2008 1:26:51 PM | A | CANC |
|
|
11:45 meeting with owner...Thomas Bacon ..###-#### and Tony Young and code enforcement on several issues.....ds Tony and I met with Mr. Bacon and discussed code violations...Was issued a correction notice to hire Plumbing contractor to repair and replace illegal and unsafe plumbing..........ds
|
PLM08-00539
| Plumbing Rough-in | 3/17/2008 | 3/18/2008 | 3/18/2008 11:24:21 AM | P | PASS |
|
|
wyatt Phone #: ###-####
|
PLM08-00413
| Plumbing Rough-in | 3/17/2008 | 3/18/2008 | 3/18/2008 10:34:57 AM | A | PASS |
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
PLM08-00535
| Plumbing Rough-in | 3/17/2008 | 3/18/2008 | 3/18/2008 10:04:30 AM | A | PART |
|
|
james Note: ri/partial groundwork Phone #: ###-#### pastial R/I .....G/W ok.....need to install nw water service and size it accordingly and seal wall at service line penetration.........ds
|
PLM08-00535
| Groundwork | 3/18/2008 | 3/18/2008 | 3/18/2008 9:55:06 AM | A | PASS |
|
|
james Note: ri/partial groundwork Phone #: ###-####
|
PLM08-00506
| Water Heater Final | 3/17/2008 | 3/18/2008 | 3/18/2008 8:54:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/17/2008 at 12:10:33 PM. Contact: ###-####.
|