FIR09-00133
| INSP-Sprinkler Rough-in/Hydro | 3/18/2009 | 3/18/2009 | 3/18/2009 4:09:13 PM | P | PASS |
|
|
The attic piping/rough-in passed and the piping can be covered.
|
BLD09-00220
| FIRE-Final Inspection | 3/18/2009 | 3/18/2009 | 3/18/2009 3:11:43 PM | P | FAIL |
|
|
Provide approved single action hardware on the new office door.
|
BLD09-00163
| FIRE-Final Inspection | 3/17/2009 | 3/18/2009 | 3/18/2009 12:44:47 PM | A | PASS |
|
|
life safety passed
|
BLD09-00260
| FIRE-Final Inspection | 3/17/2009 | 3/18/2009 | 3/18/2009 11:11:51 AM | A | PASS |
|
|
life safety passed.
|
BLD08-02282
| FIRE-Final Inspection | 3/17/2009 | 3/18/2009 | 3/18/2009 10:40:13 AM | A | PASS |
|
|
LIfe safety passed.
|
FIR09-00133
| INSP-Sprinkler Rough-in/Hydro | 3/18/2009 | 3/18/2009 | 3/18/2009 10:08:30 AM | A | PART |
|
|
The 24 hour air test was started at 9:15 with 42 1/2 psi on the guage.
|
FIR09-00161
| INSP-Final Inspection | 3/18/2009 | 3/18/2009 | 3/18/2009 8:28:04 AM | A | PASS |
|
|
permit finaled
|