Inspections for the day of: Wednesday, March 18, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00133 INSP-Sprinkler Rough-in/Hydro3/18/20093/18/20093/18/2009 4:09:13 PMPPASS
The attic piping/rough-in passed and the piping can be covered.
BLD09-00220 FIRE-Final Inspection3/18/20093/18/20093/18/2009 3:11:43 PMPFAIL
Provide approved single action hardware on the new office door.
BLD09-00163 FIRE-Final Inspection3/17/20093/18/20093/18/2009 12:44:47 PMAPASS
life safety passed
BLD09-00260 FIRE-Final Inspection3/17/20093/18/20093/18/2009 11:11:51 AMAPASS
life safety passed.
BLD08-02282 FIRE-Final Inspection3/17/20093/18/20093/18/2009 10:40:13 AMAPASS
LIfe safety passed.
FIR09-00133 INSP-Sprinkler Rough-in/Hydro3/18/20093/18/20093/18/2009 10:08:30 AMAPART
The 24 hour air test was started at 9:15 with 42 1/2 psi on the guage.
FIR09-00161 INSP-Final Inspection3/18/20093/18/20093/18/2009 8:28:04 AMAPASS
permit finaled