Inspections for the day of: Thursday, March 18, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00812 General Inspection3/18/20103/18/20103/18/2010 2:51:08 PMPPART
Due to the ruling of the point that the project pertains to ag. BMP's have not been maintained. Discharge into the north pont has a green shade from the water. channel needs to have attention brought to the 6mil plastic lining where tears and bubbling due to the high winds. Reported to Erosion Control manager with PDS over the findings. Will re-inspect on 3/25/10AM.
ESC10-00157 BMP Violation3/17/20103/18/20103/18/2010 2:10:58 PMPPASS
MIS10-00068 BLD-Conference3/17/20103/18/20103/18/2010 2:10:45 PMADONE
Stop wsork is lifted due to the sediment barrier installed in the low spots along the canal.
ESC10-00208 Site Preparation3/18/20103/18/20103/18/2010 2:04:23 PM PASS
ESC10-00189 Site Preparation3/18/20103/18/20103/18/2010 1:41:57 PM NR
ESC09-00539 Site Final3/18/20103/18/20103/18/2010 11:03:42 AMPPASS
ESC10-00119 Tracking Control3/16/20103/18/20103/18/2010 11:02:04 AMAPASS
ESC06-01332 Aging Inspection3/18/20103/18/20103/18/2010 11:01:56 AM DONE
ESC06-01332 DOC - Permit Finaled3/18/20103/18/20103/18/2010 11:01:49 AMPPASS
ESC10-00162 Site Preparation3/18/20103/18/20103/18/2010 8:21:54 AM PART
Allowing the project tio have filter fabric within the project area. If weather conditions change they are required to install appproved storm drain inlet protection.