Inspections for the day of: Friday, March 18, 2011.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00761 General Inspection3/11/20113/11/2011   
BLD10-01912 BLD-Foundation3/16/20113/18/20113/18/2011 4:47:30 PMPNR
rick Phone #: ###-####
BLD10-01913 BLD-Foundation3/16/20113/18/20113/18/2011 4:46:53 PMPPASS
rick Phone #: ###-####
ESC10-00619 Site Preparation3/17/20113/18/20113/18/2011 4:45:51 PMPPASS
Tony phone
BLD11-00037 BLD-Concrete3/17/20113/18/20113/18/2011 4:27:17 PMPPART
late pm//Ryan (or Matt @ ###-####) Phone #: ###-####
Looked at Stairway wall East side.....walls for Ramp and stairway- South side......2500 PSI design strength...Contractor says he is ordering 3500 mud.....Eng. only required 3000. Looked at CMU elevator shaft...Rebar in place and appears OK up to 6' high. They should call daily for inspection of CMU. Need test samples on Mortar. Supervisor for Benington was just filling in for today...his name was Matt. I let him know all this.
BLD11-00462 BLD-Foundation3/17/20113/18/20113/18/2011 2:45:16 PMAPASS
greg Phone #: ###-####
BLD10-02001 BLD-Final3/15/20113/18/20113/18/2011 2:43:00 PMANR
Steve ###-#### Need Ele final
ESC10-00852 Site Final3/2/20113/18/20113/18/2011 1:54:24 PMANR
Bill phone....