ESC11-00131
| General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 2:34:07 PM | | CANC |
|
|
Moved until 3/21/2011am.
|
ESC10-00495
| General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 2:33:29 PM | | PASS |
|
|
|
ESC11-00068
| Site Preparation | 3/18/2011 | 3/18/2011 | 3/18/2011 2:33:22 PM | | PART |
|
|
Message to RP: Post ESC sign where visable from the street.
|
ESC10-00546
| General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 1:30:59 PM | | DONE |
|
|
No activity
|
ESC10-00689
| BMP Violation | 3/18/2011 | 3/18/2011 | 3/18/2011 1:12:45 PM | A | PART |
|
|
Need to just sweep up area at the end of the day.
|
ESC11-00020
| General Inspection | 3/16/2011 | 3/18/2011 | 3/18/2011 9:55:15 AM | A | PART |
|
|
Verbal to RP: Clean up all foot tracking on hard surfaces at the end of each day or prior to a rain event. Also re-install all sediment barriers on perimeter of the project. Will follow up next week.
|
ESC11-00117
| Site Preparation | 3/14/2011 | 3/18/2011 | 3/18/2011 9:20:09 AM | A | PASS |
|
|
Have not installed nay of the BMP's within the drainange yet. Will installed the BMP's once they begin activities close to the drainage.
|
ESC11-00024
| General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 9:18:16 AM | | DONE |
|
|
PErmit finalled.
|
ESC11-00024
| DOC - Permit Finaled | 3/18/2011 | 3/18/2011 | 3/18/2011 9:17:58 AM | P | PASS |
|
|
|
ESC11-00031
| Tracking Control | 3/18/2011 | 3/18/2011 | 3/18/2011 8:13:20 AM | P | FAIL |
|
|
Verbal to RP: Clean up all sediment off of all hard surfaces within the street and gutterpan. Will re-inspect on 3/21/2011AM.
|