Inspections for the day of: Tuesday, March 18, 2014.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC13-03856 Final3/17/20143/18/20143/18/2014 1:03:38 PMAFAIL
Jordan Phone #: ###-####
gas regulator at water heater needs to have a shutoff valve and sediment trap before the regulator. Regulator shall be mounted in horizontal position unless stated differently by manufacturer. Need to have test port 10 pipe diameters downstream of regulator. Need to complete termperature pressure relief drain and condensate drain to an approved location.
MEC13-02787 Final3/17/20143/18/20143/18/2014 12:36:19 PMAPASS
Robert Phone #: ###-####