ESC13-00349
| General Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 1:01:34 PM | | PASS |
|
|
Grass field adajecent to courts is establishing itself. No corrections required.
|
ESC13-00601
| Aging Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 12:29:24 PM | | PASS |
|
|
Homeowner project for new garage is ongoing. No violations observed, permit posted. Approved.
|
ESC13-00480
| General Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 12:18:31 PM | | PASS |
|
|
WIP on buildings and surrounding area in this phase of Union Square. Some minor trackout onto sidewalks, but no discharges or non-compliants stockpiles observed.
RP contact Fred will have sidewalks swept this week.
|
ESC13-00824
| General Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 12:00:33 PM | | PASS |
|
|
|
ESC13-00524
| Random Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 11:49:59 AM | P | PASS |
|
|
Hackberry Ranch looks good. No sediment on roadways. Grass is starting to grow in seeded areas, all stabilization has been initiated. No violations observed.
Lower drainage channel with rill/channel erosion will be repaired after this spring.
|
ESC14-00121
| Site Preparation | 3/18/2014 | 3/18/2014 | 3/18/2014 11:31:31 AM | A | PASS |
|
|
meet RP Kevin at 10:30 for site prep.
BMPs installed, washout container onsite, permit posted. Discussed project with RP. Work is confined to backyard so am allowing no DI bags unless project changes.
|
ESC13-00755
| Tracking Control | 3/18/2014 | 3/18/2014 | 3/18/2014 10:05:38 AM | P | PASS |
|
|
Follow up inspection from CN issued 3/14:
Roundabout and Lysted were swept and DI bags were checked. New construction entrance provided at west access point and looks good. Still need to improve east contruction entrance though there is no significant trackout currently.
|
ESC13-01002
| Site Preparation | 3/17/2014 | 3/18/2014 | 3/18/2014 9:57:18 AM | A | PASS |
|
|
Clint Phone #: ###-####
Permit was issued in October 2013 so general inspections already were assigned. No construction activity has begun, RP called in site prep and excavation/construction will begin this week. No violations, BMPs installed, permit posted.
|
ESC13-01254
| Site Preparation | 3/17/2014 | 3/18/2014 | 3/18/2014 9:47:26 AM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
Stockpile from adjacent lot (already in progress) needs to be hauled away before further excavation. Perimeter BMPs installed, permit is posted.
Verbal CN to clean up area around washout, build a berm to prevent stormwater intrusion, and haul unused stockpiles/designate a stockpile parcel.
|
ESC13-01125
| Site Preparation | 3/17/2014 | 3/18/2014 | 3/18/2014 9:33:58 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
Site is ready for excavation. Discussed maintenance of concrete washout area on the same block #12.
|
ESC13-00684
| General Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 9:22:38 AM | | PASS |
|
|
No activity at time of inspection. Construction entrance looks good. Site is preparing to complete installation of utilities. No trackout. Perimeter is containing sediment to site.
|
ESC13-00340
| General Inspection | 3/18/2014 | 3/18/2014 | 3/18/2014 8:36:28 AM | | PASS |
|
|
Thrift store near completion. Parking lot and surround area is paved. No corrections required.
|