Inspections for the day of: Wednesday, March 18, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00722 INSP-Alarm Testing3/18/20153/18/20153/18/2015 3:33:38 PMPDONE
Todays inspection was only to verify horn/strobe function. All audio/visuals operated correctly.
FIR15-00082 INSP-Sprinkler Rough-in3/18/20153/18/20153/18/2015 2:54:19 PMPPASS
See the city approved plans for Womens Restroom, first floor, where piping is ok to cover as marked "ok" on the city approved plans.
FIR14-00475 INSP-Sprinkler Rough-in/Hydro3/18/20153/18/20153/18/2015 2:52:24 PMPPART
Revised plans provided but one piece of pipe installed in the remote area does not match the city approved plans. Also verification needs to be provided for the exposed 2" cpvc pipe can remain exposed. Piping can be covered except for the piping in the remote area until sizing is settled through plan review or changed to match the approved drawings.
FIR15-00081 INSP-Alarm Testing3/17/20153/18/20153/18/2015 2:49:10 PMPFAIL
Provide shielded wire, relocate smoke detector to within 12" of deck, provide orfice for inspectors test, provide document box and provide testing of devices.
BLD14-02689 FIRE-Final Inspection3/17/20153/18/20153/18/2015 12:33:15 PMAPART
East most phase of project life safety is passed. New emergency light installed as well as ceiling tile and fire extinguisher. Waiting on single action hardware for exterior exit doors
FIR14-00602 INSP-Supply line flush3/16/20153/18/20153/18/2015 9:28:57 AMAPASS
Underground flush and forward flush test passed inspection
BLD14-01856 FIRE-Conference3/17/20153/18/20153/18/2015 9:22:00 AMADONE
Doug and I went over fire dept signage
BLD14-01652 FIRE-Final Inspection3/17/20153/18/20153/18/2015 7:10:25 AMAPASS
life safety passed