Inspections for the day of: Friday, March 18, 2016.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-00162 BLD-Wall cover3/18/20163/18/20163/20/2016 9:21:15 AMPPASS
Shear // Austin Phone #: ###-####
BLD16-00506 BLD-Conference3/18/20163/18/20163/20/2016 9:20:43 AMPDONE
Jose Phone #: ###-####
After installing drain rock into old septic tank.....OK to pour footing.
BLD16-00505 BLD-Footing3/18/20163/18/20163/20/2016 9:19:08 AMPPASS
Jose Phone #: ###-####
BLD15-04006 BLD-Energy code compliance3/17/20163/18/20163/20/2016 9:18:46 AMPPASS
Insulation // Clarence Phone #: ###-####
BLD16-00761 BLD-Foundation3/17/20163/18/20163/20/2016 9:18:03 AMPPASS
Bob Phone #: ###-####
BLD16-00162 BLD-Wall cover3/17/20163/18/20163/18/2016 12:15:21 PMAPASS
Shear // Austin Phone #: ###-####
BLD15-02037 BLD-Ceiling Grid Inspection3/17/20163/18/20163/18/2016 12:14:43 PMAPASS
Phone #: ###-#### Inspection requested via web by Matt Ferguson
BLD15-02037 BLD-Energy code compliance3/17/20163/18/20163/18/2016 12:14:06 PMAPASS
The warehouse portion of the building needs ceiling insulation inspection. I left a letter from the architect for documentation in regards for doing blown-in in lieu of foam and batt at the roof sheathing. Phone #: ###-#### Inspection requested via web by Matt Ferguson
BLD15-03930 BLD-Final3/17/20163/18/20163/18/2016 12:13:16 PMANR
Phone #: ###-#### Inspection requested via web by Todd Landvatter
Need Fire final.
BLD15-01869 BLD-Energy code compliance3/17/20163/18/20163/18/2016 9:54:10 AMAPASS
Insulation // Clinton Phone #: ###-####
BLD15-01869 BLD-Framing/Rough-in3/17/20163/18/20163/18/2016 9:53:28 AMAPASS
Clinton Phone #: ###-####
BLD16-00208 BLD-Final3/17/20163/18/20163/18/2016 7:58:28 AMANR
Justin Phone #: ###-####
Need Plumb final