BLD05-01282
| FIRE-Final Inspection | 3/18/2016 | 3/18/2016 | 3/18/2016 2:37:16 PM | P | PASS |
|
|
life safety passed
|
FIR16-00159
| INSP-Final Inspection | 3/18/2016 | 3/18/2016 | 3/18/2016 12:02:24 PM | P | PASS |
|
|
permit finaled
|
BLD15-03930
| FIRE-Final Inspection | 3/17/2016 | 3/18/2016 | 3/18/2016 11:51:45 AM | A | FAIL |
|
|
Need mechanical room ceiling extended or sprinkler modifications provided. The sprinkler permit will then need to be finaled. Need the southeast exit sign repaired.
|
FIR16-00022
| INSP-Final Inspection | 3/17/2016 | 3/18/2016 | 3/18/2016 11:50:18 AM | A | CANC |
|
|
Need the mechanical room ceiling resolved prior to final sign off. I spoke to Brian about the situation.
|
FIR15-00687
| INSP-Sprinkler Rough-in/Hydro | 3/17/2016 | 3/18/2016 | 3/18/2016 10:32:26 AM | A | CANC |
|
|
OH Hydro Passed
|
FIR15-00547
| INSP-Sprinkler Rough-in/Hydro | 3/17/2016 | 3/18/2016 | 3/18/2016 10:31:30 AM | A | PASS |
|
|
UG Hydro Passed
|
BLD16-00279
| FIRE-Final Inspection | 3/17/2016 | 3/18/2016 | 3/18/2016 9:44:09 AM | A | FAIL |
|
|
Provide city approved plans, repair emergency lights, provide additional fire exitinguisher as discussed, provide sprinkler analysis for the high piled storage that is being utilized. I measured the storage at over 14'-0".
|
FIR16-00159
| INSP-Final Inspection | 3/17/2016 | 3/18/2016 | 3/18/2016 9:43:21 AM | P | CANC |
|
|
|
BLD15-01392
| FIRE-Final Inspection | 3/17/2016 | 3/18/2016 | 3/18/2016 9:10:32 AM | A | FAIL |
|
|
Provide address facing the street and provide fire dept signage as discussed
|