ELE20-00913
| Final | 3/17/2020 | 3/18/2020 | 3/18/2020 2:16:26 PM | P | PASS |
|
|
Call with questions. Barry Spencer - ###-#### Phone #: ###-#### Inspection requested via web by Rob Smith final ok
|
ELE19-04228
| Electrical Rough-In | 3/18/2020 | 3/18/2020 | 3/18/2020 2:04:09 PM | P | PASS |
|
|
1B high ceiling // Mark Phone #: ###-#### Vendor room 142 E-F Soffit, Drop lids rooms 132B. 131 E-H A-D, 130A 120C-F,. Soffits 132A-B, Hot check room 200B, 231A,B,C,D,E,F,G,H,J,K,L,M,N,P, 220B,220E
|
ELE19-01403
| Electrical Rough-In | 3/18/2020 | 3/18/2020 | 3/18/2020 1:50:46 PM | P | PASS |
|
|
Inspect boxes and raceways in elevated deck pour 5-1. Phone #: ###-#### Inspection requested via web by John Mittleider Level 5 pour 1 ok to cover
|
ELE20-00452
| Final | 3/18/2020 | 3/18/2020 | 3/18/2020 1:50:09 PM | P | PASS |
|
|
Please call prior to arrival for access. Phone #: ###-#### Inspection requested via web by Patrick Paz final ok
|
ELE19-04938
| Electrical Rough-In | 3/18/2020 | 3/18/2020 | 3/18/2020 12:45:02 PM | P | PASS |
|
|
Master bath floor heat Phone #: ###-#### Inspection requested via web by Zane Robertson COrrections made Master floor heat rough in ok
|
ELE19-04630
| Electrical Rough-In | 3/17/2020 | 3/18/2020 | 3/18/2020 11:51:43 AM | P | PASS |
|
|
lock box code 4810 Phone #: ###-#### Inspection requested via web by Ryan Wake whole house rewire house and garage rough in ok
|
ELE19-04516
| Electrical Rough-In | 3/17/2020 | 3/18/2020 | 3/18/2020 10:39:50 AM | A | PASS |
|
|
Unit island race ways under slab. Southwest Phone #: ###-#### Inspection requested via web by Stephanie Huston Kitchen island conduits, 1st floor Units 131-139 OK to cover
|
ELE20-00151
| Final | 3/17/2020 | 3/18/2020 | 3/18/2020 9:57:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Landberg Final ok
|
ELE20-00956
| Electrical Rough-In | 3/17/2020 | 3/18/2020 | 3/18/2020 9:41:36 AM | A | PASS |
|
|
Grounding inspection. Contact is Derek Ball Phone #: ###-#### Inspection requested via web by Scott Campbell Grounding ok to cover
|
ELE20-00913
| Electrical Rough-In | 3/17/2020 | 3/18/2020 | 3/18/2020 9:36:28 AM | A | PASS |
|
|
Call with questions. Barry Spencer - ###-#### Phone #: ###-#### Inspection requested via web by Rob Smith Inside panel checked. Project 90% complete. listing only ok
|
ELE20-00944
| Conference | 3/16/2020 | 3/18/2020 | 3/18/2020 9:10:52 AM | A | PASS |
|
|
Thank You! Phone #: ###-#### Inspection requested via web by Aaron Decker Discussed seperation of 2 Dweling inits. 2 meter pack with 2 100A sub panels.
|
ELE20-00908
| Electrical Rough-In | 3/16/2020 | 3/18/2020 | 3/18/2020 6:52:42 AM | P | CANC |
|
|
Please call prior to arrival for access. Phone #: ###-#### >> Inspection requested via web by Patrick Paz Inspection cancelled from web by: Patrick Paz
|