Inspections for the day of: Wednesday, March 18, 2020.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02126 BLD-Aging Inspection3/18/20203/18/20203/20/2020 8:30:09 AM PASS
wip
BLD20-00345 BLD-Foundation3/17/20203/18/20203/18/2020 3:46:45 PMPCANC
Pat Phone #: ###-####
BLD19-04871 BLD-Energy code compliance3/17/20203/18/20203/18/2020 3:45:05 PMPPASS
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD20-00894 BLD-Other3/18/20203/18/20203/18/2020 3:44:50 PMPDONE
Inspection on a completed asphalt re-roof project. Phone #: ###-#### Inspection requested via web by Michael La Pointe
BLD20-00894 DOC - Permit Finaled3/18/20203/18/20203/18/2020 3:44:37 PMPPASS
Roof appears to be installed within code requirements//
BLD20-00113 BLD-Other3/17/20203/18/20203/18/2020 3:03:50 PMPFAIL
Soffit Phone #: ###-#### Inspection requested via web by Kyle Seick//needed shear//CN posted//need hold downs, finsish nailing// hot dip nails in PT//
BLD19-03368 BLD-Foundation3/18/20203/18/20203/18/2020 2:27:10 PMPPART
wall // edgar Phone #: ###-####//need to pour frost wall at garage door opening per details on plans//WIP//
BLD19-04204 BLD-Wall Bracing3/18/20203/18/20203/18/2020 2:10:19 PMPPART
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch//ok other than a couple floor to floor straps-talked with framer//can check at framing//
BLD19-04897 BLD-Footing3/18/20203/18/20203/18/2020 1:25:32 PMPNR
Request an early afternoon inspection. 1:30 would be great! Phone #: ###-#### Inspection requested via web by Ben Sears//need subgrade approval for rest of house prior to footings//
BLD19-03799 BLD-Wall cover3/18/20203/18/20203/18/2020 12:31:14 PMPPASS
Phone #: ###-#### Inspection requested via web by John Treat//insulation ok in laundry, bath//no insulation in garage area//attic will need blow in//
BLD19-04491 BLD-Concrete3/18/20203/18/20203/18/2020 11:59:34 AMPPART
JB Phone #: ###-####//need to maintain clearance on rebar, will need tocut bar for clearances//hole depth and width ok now//
BLD20-00298 BLD-Final3/17/20203/18/20203/18/2020 11:36:36 AMANR
Please Call in advance Jake Phone #: ###-####//let Jake know he needs fire life safety final prior to final building//
BLD19-03493 BLD-Final3/17/20203/18/20203/18/2020 11:35:58 AMANR
Marcus Phone #: ###-####//need fire life safety passed prior to final//
BLD20-00634 BLD-Other3/17/20203/18/20203/18/2020 11:29:26 AMADONE
New roof Phone #: ###-#### Inspection requested via web by nick hurren
BLD20-00634 DOC - Permit Finaled3/18/20203/18/20203/18/2020 11:29:16 AMPPASS
roof appears to be installed within code requirements//no access to back//
BLD19-03897 BLD-Footing3/17/20203/18/20203/18/2020 11:02:01 AMAPART
John Phone #: ###-####//measured setbacks with contractor, setbacks appear to meet the approved plans//add rebar where noted//
BLD19-03894 BLD-Footing3/17/20203/18/20203/18/2020 11:00:11 AMAPART
John Phone #: ###-####//measured setbacks with contractor, appear to meet plans//add rebar to footings as dicussed per plans//
BLD20-00380 BLD-Footing3/17/20203/18/20203/18/2020 9:55:52 AMANR
randy Phone #: ###-####//no plans onsite//no one onsite// still need to finish rebar and elevate//water standing in some areas of footings//
BLD20-00478 BLD-Framing/Rough-in3/17/20203/18/20203/18/2020 9:37:42 AMAPART
Derek Phone #: ###-####//ok to insulate only//shear nailing ok// add straps at window headers per plans//need mechanical permit and inspection prior to any cover//
BLD18-01255 BLD-Final3/17/20203/18/20203/18/2020 8:56:50 AMAPASS
call for code access- Brock Phone #: ###-####//engineering provided and joist has been fixed//
BLD18-01255 DOC - Permit Finaled3/18/20203/18/20203/18/2020 8:56:20 AMPPASS