BLD95-00241
| INSP - Conference | 3/19/1996 | 3/19/1996 | 3/19/1996 12:00:00 AM | | PASS |
|
|
/ / 316 - Met with Dave Lightfoot to do a partial Mecanical final for rooms 153-156.
|
BLD95-00241
| INSP - Partial final | 3/19/1996 | 3/19/1996 | 3/19/1996 12:00:00 AM | | FAIL |
|
|
/ / 316 - Partial final for rooms #153-156.....Checked fire caulking around penitrations and electrical boxes..Corridor wall, Protective devices on sink drains and hot supply... Waiting for approv
|
BLD95-00529
| INSP - Foundation | 3/19/1996 | 3/19/1996 | 3/19/1996 12:00:00 AM | | PASS |
|
|
/ / 316 - Used #5 Re-bar in leiu of #4...16" verts in leiu of 24" as shown on drawing.... 3 #5 horizontals in 4' wall Cover, lap, and spacing good.
|
MEC96-00829
| INSP - Gas log/ Fireplace | 3/19/1996 | 3/19/1996 | 3/19/1996 12:00:00 AM | | PASS |
|
|
/ / 316 -
|
BLD96-00492
| INSP - Footings | 3/18/1996 | 3/19/1996 | 3/19/1996 12:00:00 AM | A | PART |
|
|
03/18/96 316 - looked at soil..OK...poured W/O inspection...Setbacks?
|
BLD1055346
| INSP - Energy code compliance | 3/19/1996 | 3/19/1996 | 3/19/1996 12:00:00 AM | P | PASS |
|
|
03/19/96 316 -
|