Inspections for the day of: Wednesday, March 19, 1997.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM97-00609 INSP - Sewer/Water lines-FINAL3/19/19973/19/19973/19/1997 12:00:00 AM PASS
/ / 330 -
PLM97-00461 INSP - Plumbing Rough-in3/18/19973/19/19973/19/1997 12:00:00 AMAPASS
03/19/97 330 - between 8 and 9:30 a.m. will be there if gone the door wi
PLM96-03558 INSP - Plumbing Rough-in3/18/19973/19/19973/19/1997 12:00:00 AMAPART
03/19/97 330 - partial r/i ok mech room ceiling
PLM96-03738 INSP - Ground work3/18/19973/19/19973/19/1997 12:00:00 AMAPART
03/19/97 330 - in handi cap bathroom late a.m.
PLM97-00151 INSP - Final3/18/19973/19/19973/19/1997 12:00:00 AMAPASS
03/19/97 330 -
PLM97-00609 INSP - Sewer/Water lines-FINAL3/18/19973/19/19973/19/1997 12:00:00 AMACANC
03/19/97 330 - READY AT 10:00
PLM97-00626 INSP - Plumbing Rough-in3/19/19973/19/19973/19/1997 12:00:00 AMPFAIL
03/19/97 330 - secure pb to metal piping prior to hb installation
PLM97-00426 INSP - Ground work3/19/19973/19/19973/19/1997 12:00:00 AMPPART
03/19/97 330 - PARTIAL RAIN DRAIN area c g/w ok
PLM97-00096 INSP - Final3/19/19973/19/19973/19/1997 12:00:00 AMPPASS
03/19/97 330 -
PLM97-00507 INSP - Manuf. home connection3/19/19973/19/19973/19/1997 12:00:00 AMPPASS
03/19/97 330 - REIN need to check with lee these are modular duplexs and next door where done on a fixture count not mobile connection any future buildings of this type will be charged at the per fixture rat
PLM97-00608 INSP - Sprinkler & Backflow3/19/19973/19/19973/19/1997 12:00:00 AMPPASS
03/19/97 330 - REIN
PLM97-00609 INSP - Sewer/Water lines-FINAL3/19/19973/19/19973/19/1997 12:00:00 AMPFAIL
03/19/97 330 - backgraded