BLD01-00412
| BLD-Energy code compliance | 3/16/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PASS |
|
|
jp ###-####
|
BLD01-00412
| BLD-Framing/Rough-in | 3/16/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PASS |
|
|
jp ###-#### reinspection
|
BLD01-00503
| BLD-Foundation | 3/17/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/17/2001 at 16:09:55. Contact: . ok no plans 3/19/2001 11:16:13 AM
|
BLD00-03008
| BLD-Conference | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | CANC |
|
|
for conf cell ###-#### -steven
|
BLD00-02396
| BLD-Final | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 09:59:11. Contact: ###-####. no plans or eng on site 3/19/2001 2:28:22 PM
|
BLD01-00306
| BLD-Framing/Rough-in | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | FAIL |
|
|
shear nailing-- pat-- ###-#### no plans 3/19/2001 3:29:36 PM
|
BLD01-00305
| BLD-Framing/Rough-in | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | FAIL |
|
|
shear nail-- ###-#### pat cn posted 3/19/2001 3:29:48 PM
|