BLD00-03616
| BLD-Framing/Rough-in | 3/15/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/15/2001 at 15:00:04. Contact: ###-####.
exterior shear ok 3/19/2001 10:59:49 AM
|
BLD00-03321
| BLD-Final | 3/16/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PASS |
|
|
Susan ###-####2
c of c# 20319 issued 3/19/2001 11:12:46 AM
|
BLD00-01844
| BLD-Concrete | 3/16/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PART |
|
|
bond beam ok on fireplace 3/19/2001 12:14:44 PM
|
BLD00-03389
| BLD-Final | 3/16/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/16/2001 at 16:04:50. Contact: ###-####.
|
BLD01-00535
| BLD-Footing | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | A | PART |
|
|
###-####
wip, ok w/ verbal corrections 3/19/2001 11:57:39 AM
|
BLD01-00535
| BLD-Footing | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 415 On 3/19/2001 11:00:22 AM
|
BLD01-00478
| BLD-Final | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 3/19/2001 11:16:33 AM
verified for owner 3/19/2001 1:45:09 PM
|
BLD00-02341
| BLD-Final | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 08:30:18. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/19/2001 at 11:05:20.
|
BLD00-01484
| BLD-Footing | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 08:37:10. Contact: ###-####.int. ftgs ok 3/20/2001 8:47:57 AM
|
BLD00-01483
| BLD-Footing | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/19/2001 at 08:38:29. Contact: ###-####.int. ftgs ok 3/20/2001 8:48:09 AM
|
MEC01-00775
| Pressure Test | 3/19/2001 | 3/19/2001 | 3/19/2001 12:00:00 AM | P | CANC |
|
|
pres test-- ###-#### bill--re- insp cancelled per Dixie
|