ELE02-00674
| Final | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | CANC |
|
|
###-#### allison see added r/i 3/19/2002 10:58:15 AM
|
ELE02-00740
| Electrical Rough-In | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | PART |
|
|
###-#### KATHY pool
bond ok no u/g 3/19/2002 10:21:49 AM
|
ELE02-00674
| Electrical Rough-In | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 315 On 3/19/2002 10:59:42 AM conference only
|
ELE01-03343
| Final | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PASS |
|
|
gary-###-####
p/s o/h rec. ok 3/19/2002 5:03:23 PM
|
ELE02-00673
| Electrical Rough-In | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/19/2002 at 10:42:55. Contact: ###-####.
|
ELE02-00673
| Electrical Rough-In | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 315 On 3/19/2002 2:05:59 PM only part of the trench ok for cover 30ftto 40 ft not deep enough shall be 18 inches it is only 12 inches
|
ELE02-00744
| Electrical Rough-In | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | FAIL |
|
|
###-#### DALE cor. posted meet with homeowner see jf for details moved house needs too meet 2002 N E C 3/19/2002 4:47:01 PM
|
ELE02-00729
| Electrical Rough-In | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | FAIL |
|
|
###-#### CHRIS corrections not made called 3/19/2002 2:50:23 PM
|