Inspections for the day of: Tuesday, March 19, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00645 Sprinkler (Final)3/15/20023/19/20023/19/2002 12:00:00 AMAPASS
HARRY ###-####
PLM02-00646 Sprinkler (Final)3/15/20023/19/20023/19/2002 12:00:00 AMAPASS
HARRY ###-####
PLM02-00647 Sprinkler (Final)3/15/20023/19/20023/19/2002 12:00:00 AMAPASS
HARRY ###-####
PLM02-00649 Sprinkler (Final)3/15/20023/19/20023/19/2002 12:00:00 AMA330
HARRY ###-####
PLM02-00648 Sprinkler (Final)3/15/20023/19/20023/19/2002 12:00:00 AMAPASS
HARRY ###-####
PLM02-00654 Sprinkler (Final)3/18/20023/19/20023/19/2002 12:00:00 AMAPASS
harry- ###-#### for backflow
PLM01-03240 Groundwork3/18/20023/19/20023/19/2002 12:00:00 AMAPART
###-#### teri basement broiler room vent test ok , grease and ss extentions into basement east end ok 3/19/2002 11:48:55 AM
PLM02-00613 Plumbing Rough-in3/18/20023/19/20023/19/2002 12:00:00 AMAPART
GATE CODE *2468 ###-#### PAT just needs tub and shower valves and the steamer unit ok to cover 3/19/2002 10:39:29 AM
PLM01-02644 Plumbing Rough-in3/18/20023/19/20023/19/2002 12:00:00 AMAPART
Scheduled by Inspector: 330 On 3/18/2002 5:13:09 PM ri ok just needs tie in in crawlspace, ok to cover 3/19/2002 11:22:44 AM
PLM02-00662 Groundwork3/18/20023/19/20023/19/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/18/2002 at 17:08:09. Contact: ###-####.
PLM02-00662 Groundwork3/18/20023/19/20023/19/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/18/2002 at 17:03:06. Contact: ###-####.
PLM02-00602 Water and/or Sewer3/18/20023/19/20023/19/2002 12:00:00 AMPPASS
Scheduled by Inspector: 330 On 3/18/2002 2:28:19 PM 2-3 pm