BLD01-01403
| FIRE-Final Inspection | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | FAIL |
|
|
###-#### HARRY wrong type of inspection; hydro for overhead okay 3/19/2002 2:27:41 PM
|
BLD01-01928
| FIRE-Final Inspection | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 16:27:14. Contact: ###-####.
|
BLD01-00856
| FIRE-Final Inspection | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | PASS |
|
|
###-#### will have extinguisher hung by the time structural inspector arrives this pm 3/19/2002 10:32:07 AM
|
FIR01-00597
| INSP-Sprinkler Rough-in/Hydro | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 15:32:53. Contact: ###-####. okay to cover hard lid areas; see sheet FP-2 of approved plans; areas inspected were identified on plans; hydro okay on this are too 3/19/2002 11:18:20 AM
|
BLD01-03277
| FIRE-Final Inspection | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | FAIL |
|
|
ryan -###-#### pending fn occ not ready for final inspection; tested extinguishing system - passed; okay to use donut machine 3/19/2002 4:08:32 PM
|
FIR02-00035
| INSP-Sprinkler Rough-in/Hydro | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 409 On 3/19/2002 2:24:10 PM hydro okay 3/19/2002 2:26:17 PM
|
BLD01-01403
| FIRE-Sprinkler Rough-in | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 409 On 3/19/2002 2:26:39 PM hydro on overhead okay 3/19/2002 2:27:59 PM
|