Inspections for the day of: Tuesday, March 19, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00129 FIRE-Final Inspection3/18/20023/19/20023/19/2002 12:00:00 AMAPASS
Fire life/safety, fire alarm and fire sprinkler finaled 3/19/2002 4:12:30 PM
MIS02-00042 FIR-Final3/18/20023/19/20023/19/2002 12:00:00 AMAPASS
Items on correction notice corrected. OK for final 3/19/2002 10:42:57 AM
FIR02-00075 INSP-Final Inspection3/18/20023/19/20023/19/2002 12:00:00 AMAFAIL
sprinkler heads need to be added on the T&A tenant side of wall 3/19/2002 3:26:21 PM
FIR02-00011 INSP-Sprinkler Rough-in3/19/20023/19/20023/19/2002 12:00:00 AMPPART
rough-in for house ok but elevation gain for underground more than shown on plans and it appears to be 1" not the 1 1/4" shown on the plan. Notified the sprinkler contractor and builder of the problems. Contractor to call for cover inspection for tenting 3/20/2002 9:23:22 AM
BLD02-00101 FIRE-Final Inspection3/19/20023/19/20023/19/2002 12:00:00 AMPFAIL
remove manual flush bolts from main exit/entrance, provide approved door hardware on all doors (lever type), remove thumbturn and dead bolt on rear door, provide 4" address letters, provide duct detector and led for hvac unit 3/20/2002 10:15:49 AM
BLD01-03175 FIRE-Final Inspection3/19/20023/19/20023/19/2002 12:00:00 AMPPASS
Added by Inspector: 430 On 3/19/2002 3:27:35 PM life/safety finaled. Fire sprinkler still needs to be finaled
FIR02-00075 INSP-Final Inspection3/19/20023/19/20023/19/2002 12:00:00 AMPPASS
Added by Inspector: 430 On 3/19/2002 5:08:40 PM Fire hose valve installation OK
BLD01-03175 FIRE-Final Inspection3/19/20023/19/20023/19/2002 12:00:00 AMPPASS
Added by Inspector: 430 On 3/19/2002 5:10:30 PM fire sprinkler system finaled