BLD02-00129
| FIRE-Final Inspection | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | PASS |
|
|
Fire life/safety, fire alarm and fire sprinkler finaled 3/19/2002 4:12:30 PM
|
MIS02-00042
| FIR-Final | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | PASS |
|
|
Items on correction notice corrected. OK for final 3/19/2002 10:42:57 AM
|
FIR02-00075
| INSP-Final Inspection | 3/18/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | A | FAIL |
|
|
sprinkler heads need to be added on the T&A tenant side of wall 3/19/2002 3:26:21 PM
|
FIR02-00011
| INSP-Sprinkler Rough-in | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PART |
|
|
rough-in for house ok but elevation gain for underground more than shown on plans and it appears to be 1" not the 1 1/4" shown on the plan. Notified the sprinkler contractor and builder of the problems. Contractor to call for cover inspection for tenting 3/20/2002 9:23:22 AM
|
BLD02-00101
| FIRE-Final Inspection | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | FAIL |
|
|
remove manual flush bolts from main exit/entrance, provide approved door hardware on all doors (lever type), remove thumbturn and dead bolt on rear door, provide 4" address letters, provide duct detector and led for hvac unit 3/20/2002 10:15:49 AM
|
BLD01-03175
| FIRE-Final Inspection | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 430 On 3/19/2002 3:27:35 PM life/safety finaled. Fire sprinkler still needs to be finaled
|
FIR02-00075
| INSP-Final Inspection | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 430 On 3/19/2002 5:08:40 PM Fire hose valve installation OK
|
BLD01-03175
| FIRE-Final Inspection | 3/19/2002 | 3/19/2002 | 3/19/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 430 On 3/19/2002 5:10:30 PM fire sprinkler system finaled
|