FIR03-00035
| INSP-Supply line flush | 3/17/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | A | PART |
|
|
The 6" underground supply was flushed. Out of a 4" outlet we got 3 1/4 psi which translates to 780 gallons. This flow needs to be verified to see if it will meet any of the exceptions to the 880 gallons required in NFPA 13 3/19/2003 11:22:24 AM
|
FIR02-00385
| INSP-Conference | 3/17/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | A | PASS |
|
|
above ground hydro test for the pre-action system in the freezer is ok. The system was tested from the control valve at base of riser 3/19/2003 2:25:11 PM
|
FIR03-00059
| INSP-Final Inspection | 3/18/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | A | FAIL |
|
|
No approved plans on site 3/19/2003 8:22:57 AM
|
BLD03-00260
| FIRE-Final Inspection | 3/18/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | A | FAIL |
|
|
CARLA; Phone #: ###-#### Provide annual inspection for the fire extinguisher in the spa, provide emergency light in the spa and repair the exit sign in the corridor outside of the spa 3/19/2003 8:51:33 AM
|
BLD02-02068
| FIRE-Final Inspection | 3/19/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | P | CANC |
|
|
craig; Phone #: ###-#### Cancelled by the contractor. Can not get the duct smoke detectors to operate correctly 3/19/2003 4:34:44 PM
|
FIR03-00035
| INSP-Supply line flush | 3/19/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | P | PASS |
|
|
The valve at the street was half way closed. Flushed UG with open valve and everything looks good
|
FIR03-00099
| INSP-Conference | 3/18/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | P | PASS |
|
|
Underground supply, 15' of stub out is ok to cover 3/19/2003 2:08:28 PM
|
FIR03-00012
| INSP-Final Inspection | 3/18/2003 | 3/19/2003 | 3/19/2003 12:00:00 AM | P | FAIL |
|
|
provide the correct smoke detector as per the submittals, verify a dedicated circuit, provide map, verify battery standby once the dedicated circuit is found, provide sign on door, test all initiating devices and verify signals 3/19/2003 4:14:10 PM
|