BLD03-02314
| BLD-Final | 3/17/2004 | 3/19/2004 | 3/19/2004 7:15:02 AM | A | CANC |
|
|
Phone #: ###-#### x33355 Internet Inspection Request from: Dennis Holmes Inspection cancelled from web by: Dennis Holmes
|
BLD02-02008
| BLD-Aging Inspection | 3/19/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | | FAIL |
|
|
First that I have heard about it. I'll talk to Doug, but I believe it is standard that we will not sign off until condition is met or bonded for. CO is our leverage.
Can anyone shed some light on this?
>>> JENIFER GILLILAND 03/15/04 10:04AM >>>
Teresa--
We have a permit that we are having a hard time finaling out because they put in a storm drainage system that did not conform with the plans that were approved by the city. At least that is what the engineer who drew up the plans says. The project, a church parking lot, is completed. Before the project is finaled out, the engineer is supposed to provide the city with a letter that certifies that the design has been built per his specs. Public Works will not sign off on the project until that letter is provided. This permit keeps going around and around in our permit aging system. The permit only involved a parking lot, so going after someone's CO or turning off the lights might be a little drastic. It is also a public works issue and P and Z hasn't signed off on it yet. Any suggestions on how we can get some action on this?
*Broadway Ward Stake Parking Lot Expansion* - To clear, grub, excavate, grade, and pave for an additional 82 parking lot spaces per engineered plans on file as approved by public works department. Install curbing, paving, striping, and landscaping as noted on the plans. No buildings to be constructed or installed under this permit. PC#530-02 CUP02-00082 SR ESC02-00346
3/22/2004 4:54:01 PM
|
BLD03-02563
| BLD-Aging Inspection | 3/19/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | | PART |
|
|
wip 3/19/2004 9:11:32 AM
|
BLD03-02705
| BLD-Aging Inspection | 3/19/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | | DONE |
|
|
|
BLD03-02307
| BLD-Foundation | 3/18/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | A | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-02308
| BLD-Foundation | 3/18/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | A | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-00059
| BLD-Final | 3/18/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | P | PASS |
|
|
sarah or michael; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-02616
| BLD-Footing | 3/19/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | P | PASS |
|
|
Gary; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
BLD03-02811
| BLD-Conference | 3/19/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 3/19/2004 at 11:28:41 AM. Contact: ###-####. out of time. rolled over. 3/19/2004 4:41:45 PM
|
BLD04-00240
| BLD-Conference | 3/18/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | P | FAIL |
|
|
pending action from plan review to address 2 hr at roof truss septration. 3/22/2004 4:48:20 PM
|
BLD04-00239
| BLD-Conference | 3/18/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | P | FAIL |
|
|
pending action from plan review for roof truss 2 hr septration. 3/22/2004 4:49:08 PM
|
BLD03-02812
| BLD-Final | 3/16/2004 | 3/19/2004 | 3/19/2004 12:00:00 AM | P | NR |
|
|
###-#### Jim,; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|