ELE06-02581
| Electrical Rough-In | 3/19/2007 | 3/19/2007 | 3/19/2007 3:05:12 PM | P | PASS |
|
|
hank ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok cover ri
|
ELE07-00892
| Temporary Service | 3/19/2007 | 3/19/2007 | 3/19/2007 3:04:47 PM | P | PASS |
|
|
darrin; Phone #: ###-#### Internet Inspection Request from: Victoria Beall t/s u/g n ok
|
ELE07-00898
| Electrical Rough-In | 3/19/2007 | 3/19/2007 | 3/19/2007 2:27:55 PM | P | PASS |
|
|
Lynn; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok cover ri p/s u/g n ok
|
ELE06-04170
| Rough-In Permanent Service | 3/19/2007 | 3/19/2007 | 3/19/2007 1:48:05 PM | P | PASS |
|
|
lloyd ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith p/s u/g n ok no ri needed
|
ELE07-00549
| Electrical Rough-In | 3/19/2007 | 3/19/2007 | 3/19/2007 1:03:45 PM | P | PASS |
|
|
Need to look at the UFER Chris; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok cover ri for building ufer ground has to be to building rebar
|
ELE07-00870
| Temporary Service | 3/15/2007 | 3/19/2007 | 3/19/2007 10:57:29 AM | A | PASS |
|
|
Alan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus t/s u/g n ok
|
ELE07-00871
| Temporary Service | 3/15/2007 | 3/19/2007 | 3/19/2007 10:56:45 AM | A | PASS |
|
|
Alan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus t/s u/g n ok
|
ELE07-00818
| Electrical Rough-In | 3/19/2007 | 3/19/2007 | 3/19/2007 10:26:56 AM | A | PASS |
|
|
look on east wall for panel board install and inspect. thank you. contact:Joe Phone #: ###-#### pk cover east wall for panel board
|
ELE06-03040
| Final | 3/16/2007 | 3/19/2007 | 3/19/2007 10:10:15 AM | A | PASS |
|
|
supervisor 02, rkpeterson final out on fab tool in bldg 24 in fab. this is one of several for Monday morning. thanks Ron Phone #: ###-#### ok final
|
ELE06-03038
| Final | 3/16/2007 | 3/19/2007 | 3/19/2007 10:09:44 AM | A | PASS |
|
|
supervisor 02 rkpeterson, Mike this is one fab tool of several to final out in bldg 24. I''ll be free after 9, monday morning. thanks Ron Phone #: ###-#### ok final
|
ELE06-02379
| Final | 3/16/2007 | 3/19/2007 | 3/19/2007 10:09:11 AM | A | PASS |
|
|
supervisor 02, rkpeterson Mike there are several FAb tools to final I''ll be busy from 8 to 9, but available this is in bldg 24 fab 4. Phone #: ###-#### ok final
|
ELE06-03630
| Final | 3/16/2007 | 3/19/2007 | 3/19/2007 10:08:36 AM | A | PASS |
|
|
Final inspection of clean rm. tool in building 16 for SUP03 ###-####. Phone #: ###-#### ok final
|
ELE06-02375
| Final | 3/16/2007 | 3/19/2007 | 3/19/2007 10:08:02 AM | A | PASS |
|
|
supervisor, 02 final, fab 4 bldg 24 tool needs to final out. Thanks Phone #: ###-#### ok final
|
ELE06-04535
| Final | 3/15/2007 | 3/19/2007 | 3/19/2007 10:07:27 AM | A | PASS |
|
|
supervisor 02, rkpeterson a bldg 24 fab 4 fab tool to final off, I''m here MOnday but busy from 8 to 9, call me ###-####. thanks Phone #: ###-#### ok final
|
ELE06-03951
| Final | 3/15/2007 | 3/19/2007 | 3/19/2007 10:06:44 AM | A | PASS |
|
|
supp 02 rkpeterson supervisor, ###-#### this is a fab tool in bldg 24 to final off. I''ll be available after 9:00 if that works. Phone #: ###-#### ok final
|
ELE06-04063
| Final | 3/16/2007 | 3/19/2007 | 3/19/2007 9:38:58 AM | A | PASS |
|
|
SUP06, John Davis, I need a final for the conferance room in building 36 (area 7), 2nd floor. This will not final the electrical permit. Phone #: ###-#### ok final
|
ELE06-04491
| Final | 3/16/2007 | 3/19/2007 | 3/19/2007 9:37:54 AM | A | PASS |
|
|
SUP06, John Davis, I need a final for a few devices that are installed in a new wall installed in building 33. Phone #: ###-#### ok final
|