FIR08-00819
| FIR-Aging Inspection | 3/19/2009 | 3/19/2009 | 3/19/2009 5:13:45 PM | | NR |
|
|
Pending site inspection request for work completed.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 3/16/2009 | 3/19/2009 | 3/19/2009 5:11:46 PM | P | PART |
|
|
Overhead hydrostatic testing for the 5th, 6th, 7th, 9th and 11th floor passed. 8th floor hydrostatic test failed due to pressure loss at the guage.
|
BLD09-00333
| FIRE-Final Inspection | 3/19/2009 | 3/19/2009 | 3/19/2009 5:01:21 PM | P | CANC |
|
|
Incorrect permit number request, was intended for BLD09-00033.
|
FIR08-00728
| INSP-Final Inspection | 3/18/2009 | 3/19/2009 | 3/19/2009 4:59:20 PM | P | PASS |
|
|
Correction items verified for completion, final site alarm testing passed, permit finaled.
|
BLD09-00107
| FIRE-Final Inspection | 3/19/2009 | 3/19/2009 | 3/19/2009 4:58:33 PM | P | PASS |
|
|
Fire life safety finaled, inspection passed.
|
BLD09-00033
| FIRE-Final Inspection | 3/19/2009 | 3/19/2009 | 3/19/2009 4:57:17 PM | P | PASS |
|
|
Life safety inspection completed satisfactory.
|
FIR08-00766
| INSP-Supply line flush | 3/19/2009 | 3/19/2009 | 3/19/2009 4:55:42 PM | A | PART |
|
|
UG lead in flush for the 3rd to west riser as marked on approved plans completed okay.
|
BLD08-02249
| FIRE-Final Inspection | 3/18/2009 | 3/19/2009 | 3/19/2009 4:54:11 PM | A | PART |
|
|
Unit 548 fire life safety inspection passed.
|