FIR09-00027
| INSP-Sprinkler Rough-in | 3/18/2009 | 3/19/2009 | 3/23/2009 2:47:55 PM | P | PASS |
|
|
The thrust block at the 45 has been replaced and the remaining underground piping can be covered.
|
FIR09-00133
| INSP-Sprinkler Rough-in | 3/18/2009 | 3/19/2009 | 3/19/2009 10:18:46 AM | A | PASS |
|
|
24 hour air test for the overhead dry system passed.
|
FIR05-00589
| INSP-Conference | 3/19/2009 | 3/19/2009 | 3/19/2009 9:03:40 AM | P | DONE |
|
|
I spoke to mike about getting this permit finaled. He stated that he would follow up on monday.
|