Inspections for the day of: Thursday, March 19, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00634 BMP Violation3/17/20093/19/20093/19/2009 3:56:12 PMPFAIL
Final Verbal to RP:
All issues from the previous were not dealt with by the RP. I have given a deadline of 3/20/09 PM to have all issues dealt with. Will re-inspect on 3/20/09 4:30 PM.
ESC07-00987 General Inspection3/16/20093/19/20093/19/2009 2:00:59 PMAFAIL
Still need to deal with the issues from the prior inspection. Told RP to have corrected by 3/20/09 4PM. Will re-inspect on 3/20/09 PM.
ESC08-01004 Random Inspection3/19/20093/19/20093/19/2009 1:33:34 PMPPASS
wattle installed correctly.
ESC09-00102 Site Preparation3/19/20093/19/20093/19/2009 1:29:50 PM NR
Will re-inspect in one week.
ESC09-00085 BMP Violation3/16/20093/19/20093/19/2009 1:10:57 PMANR
Work on the next project has not occured yet.
ESC08-00842 BMP Violation3/17/20093/19/20093/19/2009 10:23:20 AMAPASS
ESC08-00924 General Inspection3/19/20093/19/20093/19/2009 10:22:18 AMAFAIL
Verbal to RP:
1. Provide a trash debris container for all solid wast on site.
2. Maintain silt fence along perimeter of project area.
Will re-inspect on 3/23/09 PM.
ESC09-00064 Site Preparation3/19/20093/19/20093/19/2009 9:34:33 AM PART
RP is in a meeting. Refer correction to his assistant Brian:
Told them to stay on top of sweeping of all hard surfaces. Put in protection on stockpile along trenched areas within the back of the project where utilities are being installed if not completed by 3/20/09 PM. Will re-inspect on 3/23/09 AM