Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00651 INSP-Supply line flush3/19/20123/19/20123/19/2012 5:44:04 PMPPART
UG fire supply line flush completed acceptable.
FIR12-00103 INSP-Conference3/19/20123/19/20123/19/2012 5:43:24 PMADONE
Regarding site inspection schedule.
BLD11-01743 FIRE-Sprinkler Rough-in3/19/20123/19/20123/19/2012 5:42:26 PMAPART
Dry system rough-in inspection completed. Discussed protection for combustible concealed spaces and allowable exceptions per NFPA 13.
FIR11-00575 INSP-Alarm Testing3/19/20123/19/20123/19/2012 5:39:54 PMAPART
Completed fire sprinkler monitoring test for systems installed to date- system 4,10,2, 8 duct and 8OH flows and tampers. Items noted include; incorrect descriptor at duct system 8 control valve, missing PIV tamper, one incomplete riser manifold, deluge valve for opening protection is unfinished.
FIR11-00664 INSP-Final Inspection3/19/20123/19/20123/19/2012 5:22:49 PMAPART
Tamper switch at the fire sprinkler supply control valve tested satisfactory. Final pending FIR11-00575.