FIR13-00011
| INSP-Sprinkler Rough-in | 3/11/2013 | 3/12/2013 | | P | |
|
|
This is for the 3rd, 4th & 5th Fl. Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR11-00216
| FIR-Aging Inspection | 3/19/2013 | 3/19/2013 | 3/21/2013 7:54:56 AM | | DONE |
|
|
|
BLD13-00496
| FIRE-Final Inspection | 3/18/2013 | 3/19/2013 | 3/19/2013 5:22:44 PM | P | PASS |
|
|
Life safety passed provided the non-required exit sign is removed.
|
FIR13-00102
| INSP-Sprinkler Rough-in/Hydro | 3/19/2013 | 3/19/2013 | 3/19/2013 5:19:55 PM | P | PART |
|
|
UG fire supply line approved for bury as noted and dated on plans.
|
BLD12-03060
| FIRE-Final Inspection | 3/19/2013 | 3/19/2013 | 3/19/2013 5:17:42 PM | A | PART |
|
|
Pending adjustments at fire sprinkler coverage.
|
BLD12-02258
| FIRE-Conference | 3/19/2013 | 3/19/2013 | 3/19/2013 5:16:35 PM | A | DONE |
|
|
|