FIR12-00574
| INSP-Sprinkler Rough-in | 3/18/2013 | 3/19/2013 | 3/19/2013 3:53:26 PM | P | PASS |
|
|
See the city approved plans for locations marked "ok" where piping can be covered.
|
FIR12-00330
| INSP-Supply line flush | 3/18/2013 | 3/19/2013 | 3/19/2013 3:38:51 PM | P | PASS |
|
|
Underground flush passed
|
BLD12-03003
| FIRE-Final Inspection | 3/19/2013 | 3/19/2013 | 3/19/2013 2:53:15 PM | P | PASS |
|
|
Life safety passed. Craig is going to post the corrected "Occupant Load" sign prior to the building inspection.
|
BLD13-00103
| FIRE-Final Inspection | 3/19/2013 | 3/19/2013 | 3/19/2013 2:11:03 PM | P | PASS |
|
|
Life safety passed
|
FIR11-00503
| INSP-Final Inspection | 3/12/2013 | 3/19/2013 | 3/19/2013 1:34:46 PM | A | CANC |
|
|
To be rescheduled for spring break
|
BLD13-00495
| FIRE-Final Inspection | 3/18/2013 | 3/19/2013 | 3/19/2013 9:59:04 AM | A | PASS |
|
|
life safety passed
|
BLD13-00529
| FIRE-Final Inspection | 3/18/2013 | 3/19/2013 | 3/19/2013 7:48:23 AM | A | FAIL |
|
|
Resubmit plans showing the actual floor layout, repair exit signs and emergency lights, provide emergency lighting in all common paths of egress (if not existing) as discussed, provide fire extinguishers as discussed.
|