ELE12-01368
| ELE-Aging Inspection | 3/19/2014 | 3/19/2014 | 3/25/2014 3:10:58 PM | | DONE |
|
|
Left notice, looks still under construction
|
ELE14-00615
| Final | 3/18/2014 | 3/19/2014 | 3/19/2014 3:57:17 PM | P | PASS |
|
|
Morris Hill Cemetery coming from downtown, you will take Latah to the 3rd entrance of the cemetery then turn left thru the gate and the propane tank will be on the right Phone #: ###-#### >> Inspection requested via web by Rick Beckman Final ok
|
ELE14-00615
| Electrical Rough-In | 3/19/2014 | 3/19/2014 | 3/19/2014 3:56:42 PM | P | PASS |
|
|
Morris Hill Cemetery coming from downtown, you will take Latah to the 3rd entrance of the cemetery then turn left thru the gate and the propane tank will be on the right Phone #: ###-#### >> Inspection requested via web by Rick Beckman Rough in ok
|
ELE12-01806
| Final | 3/19/2014 | 3/19/2014 | 3/19/2014 3:33:10 PM | P | PASS |
|
|
Sign final ok
|
ELE14-00590
| Permanent Service | 3/19/2014 | 3/19/2014 | 3/19/2014 2:34:07 PM | P | PASS |
|
|
###-#### During service change illegal circuits found that fed an addition built in 1995. 3 Branch circuits replaced that feed addition and spiced in attic. p/s o/h rec ok
|
ELE14-00390
| Final | 3/19/2014 | 3/19/2014 | 3/19/2014 2:06:44 PM | P | PASS |
|
|
Contact: Frank Yantis Phone #: ###-#### >> Inspection requested via web by Deb Gooden Final ok
|
ELE13-03133
| Final | 3/19/2014 | 3/19/2014 | 3/19/2014 1:27:20 PM | P | PASS |
|
|
This is for a re-inspection. adding 2 lock outs and 1 arch fault breaker. Phone #: ###-#### >> Inspection requested via web by Brian Hughes Final ok
|
ELE14-00590
| Final | 3/17/2014 | 3/19/2014 | 3/19/2014 1:10:02 PM | P | CANC |
|
|
If you have any questions, please call Calvin ###-####. Thank You. Phone #: ###-#### >> Inspection requested via web by Clay Morgan Needed rough in and permanent service
|
ELE14-00590
| Electrical Rough-In | 3/19/2014 | 3/19/2014 | 3/19/2014 1:09:15 PM | P | PASS |
|
|
If you have any questions, please call Calvin ###-####. Thank You. Phone #: ###-#### >> Inspection requested via web by Clay Morgan Basement rough in ok cover
|
ELE14-00409
| Electrical Rough-In | 3/19/2014 | 3/19/2014 | 3/19/2014 12:30:02 PM | A | PASS |
|
|
Will be ready after 10 please call before inspection to insure access thanks shaun ###-#### Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman Floor heat rough in ok cover
|
ELE14-00302
| Electrical Rough-In | 3/18/2014 | 3/19/2014 | 3/19/2014 10:11:44 AM | A | PASS |
|
|
Inspect floor heat, please call Clay ###-#### when on your way so he can meat you, lock box 3975. Thank you.. Phone #: ###-#### >> Inspection requested via web by Clay Morgan Floor heat rough in ok cover
|
ELE14-00635
| Electrical Rough-In | 3/18/2014 | 3/19/2014 | 3/19/2014 9:43:19 AM | A | PASS |
|
|
Underground. Please let me know if you have any problems. Thanks. Clay ###-#### Phone #: ###-#### >> Inspection requested via web by Clay Morgan GFCI required for 14" underground on final. Underground rough in ok cover
|
ELE14-00390
| Final | 3/18/2014 | 3/19/2014 | 3/19/2014 9:17:38 AM | A | FAIL |
|
|
Contact: Frank Yantis Phone #: ###-#### >> Inslepection requested via web by Deb Gooden 400.5- Flexible cord ampacities, Steam kettle max cord ampacity 35 amps. Rotisserie units max cord ampacity 25 amps
|