FIR13-00620
| INSP-Final Inspection | 3/18/2014 | 3/19/2014 | 3/19/2014 3:05:47 PM | A | FAIL |
|
|
Not ready for a final yet. Overhead hydro passed. Forward flush passed. Trip test of 28 seconds passed. Rough-in inspection for concealed area passed. Missing seismic brace provided. Signal test of tampers and pressure switches passed. Still need the 24 hour air test.
|
FIR14-00015
| INSP-Final Inspection | 3/18/2014 | 3/19/2014 | 3/19/2014 3:03:18 PM | A | FAIL |
|
|
Provide map, provide secured power supply enclosure and change the text for the dialer trouble and the PIV as discussed.
|
BLD13-01286
| FIRE-Final Inspection | 3/19/2014 | 3/19/2014 | 3/19/2014 1:46:33 PM | P | PASS |
|
|
life safety passed
|
FIR13-00263
| INSP-Final Inspection | 3/19/2014 | 3/19/2014 | 3/19/2014 1:44:55 PM | P | PASS |
|
|
permit finaled
|
FIR13-00263
| INSP-Sprinkler Rough-in/Hydro | 3/19/2014 | 3/19/2014 | 3/19/2014 1:44:37 PM | P | PASS |
|
|
Permit finaled
|
BLD13-02789
| FIRE-Final Inspection | 3/18/2014 | 3/19/2014 | 3/19/2014 10:16:24 AM | A | FAIL |
|
|
Provide revised floor plan as discussed and provide single action hardware on the two exit path doors as marked on the approved plans.
|
BLD13-02791
| FIRE-Final Inspection | 3/18/2014 | 3/19/2014 | 3/19/2014 10:15:36 AM | A | FAIL |
|
|
Provide emergency lighting as required by the approved plans.
|