Inspections for the day of: Wednesday, March 19, 2014.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00620 INSP-Final Inspection3/18/20143/19/20143/19/2014 3:05:47 PMAFAIL
Not ready for a final yet. Overhead hydro passed. Forward flush passed. Trip test of 28 seconds passed. Rough-in inspection for concealed area passed. Missing seismic brace provided. Signal test of tampers and pressure switches passed. Still need the 24 hour air test.
FIR14-00015 INSP-Final Inspection3/18/20143/19/20143/19/2014 3:03:18 PMAFAIL
Provide map, provide secured power supply enclosure and change the text for the dialer trouble and the PIV as discussed.
BLD13-01286 FIRE-Final Inspection3/19/20143/19/20143/19/2014 1:46:33 PMPPASS
life safety passed
FIR13-00263 INSP-Final Inspection3/19/20143/19/20143/19/2014 1:44:55 PMPPASS
permit finaled
FIR13-00263 INSP-Sprinkler Rough-in/Hydro3/19/20143/19/20143/19/2014 1:44:37 PMPPASS
Permit finaled
BLD13-02789 FIRE-Final Inspection3/18/20143/19/20143/19/2014 10:16:24 AMAFAIL
Provide revised floor plan as discussed and provide single action hardware on the two exit path doors as marked on the approved plans.
BLD13-02791 FIRE-Final Inspection3/18/20143/19/20143/19/2014 10:15:36 AMAFAIL
Provide emergency lighting as required by the approved plans.