Inspections for the day of: Monday, March 19, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM18-00902 Plumbing Rough-in3/19/20183/19/20183/19/2018 4:28:14 PMPNR
Phone #: ###-#### Inspection requested via web by Branden Steers
PLM18-00545 Final3/19/20183/19/20183/19/2018 4:26:45 PMPPASS
Phone #: ###-#### Inspection requested via web by Nicholas Paige
PLM18-01100 Plumbing Rough-in3/19/20183/19/20183/19/2018 2:46:07 PMPFAIL
Phone #: ###-#### Inspection requested via web by PATTY KIRK..
1. Install a cleanout at the kitchen sink drain.
2. The PVC waste and overflow cannot be glued to the ABS pipe with ABS glue. Use an approved shielded band
PLM18-01041 Final3/14/20183/19/20183/19/2018 2:08:37 PMPNH
INSTALLER JESSE ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt. Tagged door
PLM18-01104 Final3/19/20183/19/20183/19/2018 1:56:05 PMPPASS
Dan to Final inspection Phone #: ###-#### Inspection requested via web by Byion Barnett
PLM18-01104 DOC - Permit Finaled3/19/20183/19/20183/19/2018 1:55:45 PMPPASS
sewer only
PLM18-00384 Final3/13/20183/19/20183/19/2018 10:36:17 AMAPASS
Please inspect as early as possible in AM. Debie Malone ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
PLM18-00545 Final3/19/20183/19/20183/19/2018 10:23:57 AMPCANC
already scheduled
PLM18-00545 Final3/16/20183/19/20183/19/2018 10:10:07 AMACANC
Phone #: ###-#### >> Inspection requested via web by Nicholas Paige Inspection cancelled from web by: Nicholas Paige
PLM17-01706 PLM-Aging Inspection3/19/20183/19/20183/19/2018 9:40:41 AM PASS
Expired for no actioin on permit
PLM17-01706 DOC - Permit Expired3/19/20183/19/20183/19/2018 9:40:18 AMPPASS
No action
PLM17-04131 Plumbing Rough-in3/15/20183/19/20183/19/2018 9:39:35 AMAFAIL
Call ahead // Belinda Phone #: ###-####.
1. Provide nail plate and plate strap pipe protection.
2. Install a cleanout at the kitchen sink and lavatory.
3. Install a hard cold line to the kitchen sink.
4. The drainage and vent system is required to be tested by water or air.