ELE18-02665
| Electrical Rough-In | 3/19/2019 | 3/19/2019 | 3/19/2019 3:02:23 PM | P | PASS |
|
|
Contact: Rich Bail. Ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden... grid complete
|
ELE16-02973
| ELE-Aging Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 2:17:54 PM | | FAIL |
|
|
contractor is needing to schedule final and get access to do inspection next step will be to post correction on door requesting inspection in 5 days after posted
|
ELE18-03224
| Electrical Rough-In | 3/19/2019 | 3/19/2019 | 3/19/2019 1:26:00 PM | P | PASS |
|
|
Contact: Wes Powell. Ceiling inspection please Phone #: ###-#### Inspection requested via web by Deb Gooden... exterior soffits x 2-ok to cover
|
ELE18-00947
| Final | 3/19/2019 | 3/19/2019 | 3/19/2019 12:35:12 PM | P | PASS |
|
|
call first ###-#### Phone #: ###-#### Inspection requested via web by PAT MILLER... circuit for irrigation pump back of lot...ok to final
|
ELE19-00936
| Final | 3/18/2019 | 3/19/2019 | 3/19/2019 11:26:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jeremiah Mitchell.... perm service reconnection ok...re-energized at time of inspection
|
ELE19-00943
| Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 10:35:19 AM | P | PASS |
|
|
We will be digging in the conduit for IPCO starting at 8 am will need an inspection to cover trench, in a busy public area. Phone #: ###-#### Inspection requested via web by robert feller... informed contractor that verification of depth needs done by IPCO...did verify the depth of 3ft at time for need to backfill-high traffic area ground rods verified-2 for new service
|
ELE19-00542
| Final | 3/18/2019 | 3/19/2019 | 3/19/2019 10:06:59 AM | A | CANC |
|
|
building should be open for business. Work completed was re-routing wires for door and window. added Exit sign. Phone #: ###-#### Inspection requested via web by Paula Gratiot... rough inspection needed...final will need scheduled once electrical work finished
|
ELE19-00542
| Electrical Rough-In | 3/19/2019 | 3/19/2019 | 3/19/2019 10:05:34 AM | A | PASS |
|
|
building should be open for business. Work completed was re-routing wires for door and window. added Exit sign. Phone #: ###-#### Inspection requested via web by Paula Gratiot... rough in ok to cover...new door added-2 outlets, egress light and exit sign
|
ELE19-00946
| Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 9:50:58 AM | A | PASS |
|
|
Homeowner is Larry, number is ###-####. He knows to be there to get in. Phone #: ###-#### Inspection requested via web by Andy Duckett.... rough ok to cover
|
ELE19-00938
| Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 9:17:07 AM | A | PASS |
|
|
For access please call Ed 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott.. rough ok to cover...new kitchen layout check micro circuit at final
|
ELE19-00912
| Rough-In Permanent Service | 3/18/2019 | 3/19/2019 | 3/19/2019 8:49:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Nelson... rough ok to cover p/s u/g new ok
|