PLM00-00545
| Final | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 13:09:00. Contact: ###-####. Water & backflow final. 3/2/00 11:11:28 AM
|
PLM00-00521
| Water and/or Sewer | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 16:22:27. Contact: ###-####. Sewer and water outside final. 3/2/00 11:11:17 AM
|
PLM00-00559
| Plumbing Rough-in | 3/2/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 11:27:08. Contact: ###-####. Test waste- test BFV- Install thermal tank. 3/3/00 8:50:55 AM
|