BLD99-03412
| BLD-Framing/Rough-in | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | A | FAIL |
|
|
Dan ###-#### or ###-####--- Mechanical connections, PT. ld. transfers, dbl. studs & floor joists wrong or missing. 3/6/00 10:48:50 AM
|
BLD99-03749
| BLD-Final | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | A | PASS |
|
|
###-#### C/C issued. 3/6/00 10:51:18 AM
|
BLD00-00264
| BLD-Framing/Rough-in | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD99-03709
| BLD-Wall cover | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 17:00:14. Contact: .
|
BLD00-00328
| BLD-Foundation | 2/29/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 10:03:16. Contact: ###-####.--------bill--###-####
|
BLD99-03656
| BLD-Wall cover | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 10:06:47. Contact: ###-####. Shear ok. 3/6/00 10:48:08 AM
|
BLD99-03397
| BLD-Final | 3/2/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | P | FAIL |
|
|
john ###-#### key over front door Mechanical C/N outstanding (2) 3/6/00 10:47:58 AM
|
BLD00-00362
| BLD-Foundation | 3/2/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/02/2000 at 08:45:00. Contact: ###-####. Poured w/o inspection- no string lines or property pius placed. 3/6/00 10:44:28 AM
|
BLD98-02527
| BLD-Framing/Rough-in | 3/2/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | P | FAIL |
|
|
Mark ###-#### Stud solid under beams, mechanical connection required at knee joint So. wall & need electrical inspection.3/6/00 10:45:59 AM
|
MEC99-04340
| Final | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2000 at 15:44:33. Contact: ###-####.
|
BLD00-00059
| BLD-Foundation | 3/1/2000 | 3/2/2000 | 3/2/2000 12:00:00 AM | P | PART |
|
|
Sheer panel Ross ###-#### Shear nailing ok. 3/6/00 10:48:15 AM
|