Inspections for the day of: Friday, March 2, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-01781 Final3/1/20013/2/20013/2/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/01/2001 at 11:38:38. Contact: ###-####. pipe t&p drain from shower steamer to approved location 3/2/2001 9:32:37 AM
PLM01-00362 Plumbing Rough-in3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/01/2001 at 14:19:25. Contact: ###-####. relocation of prvious r/i. ok 3/2/2001 9:55:48 AM
PLM00-02912 Plumbing Rough-in3/1/20013/2/20013/2/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/01/2001 at 15:58:32. Contact: ###-####. 50' of 4" waste from main to north fire riser room. 3/2/2001 11:04:53 AM
PLM01-00125 Final3/2/20013/2/20013/2/2001 12:00:00 AMAPASS
Added by Inspector: 330 On 3/2/2001 9:49:15 AM
PLM00-04299 Water and/or Sewer3/2/20013/2/20013/2/2001 12:00:00 AMAPASS
Added by Inspector: 330 On 3/2/2001 11:36:04 AM
PLM01-00477 Other3/2/20013/2/20013/2/2001 12:00:00 AMPPART
Added by Inspector: 330 On 3/2/2001 4:36:10 PM conference on solid cover and venting of sump
PLM00-04069 Final3/2/20013/2/20013/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/02/2001 at 10:27:03. Contact: ###-####.
PLM01-00333 Final3/2/20013/2/20013/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/02/2001 at 07:57:22. Contact: ###-####.
PLM00-04403 Plumbing Rough-in3/2/20013/2/20013/2/2001 12:00:00 AMPPART
###-#### restrooms ground floor gw ok 3/2/2001 2:53:29 PM
PLM01-00522 Water and/or Sewer3/2/20013/2/20013/2/2001 12:00:00 AMPPASS
###-####
PLM01-00523 Water and/or Sewer3/2/20013/2/20013/2/2001 12:00:00 AMPPASS