MEC01-00275
| Final | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 09:38:55. Contact: ###-####.
|
MEC01-00620
| Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | PASS |
|
|
Pierce ###-####
|
MEC01-00620
| Pressure Test | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-00434
| Final | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | NR |
|
|
finish unit heaters 3/2/2001 12:12:19 PM
|
MEC01-00120
| Pressure Test | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC01-00120
| Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | PASS |
|
|
|
MEC01-00618
| Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | PART |
|
|
###-#### UPPER AND LOWER UNIT EAST SIDE ONLY 1 EACH, these units ok, called joe told him to finish rest of bldg as these units 3/2/2001 2:24:23 PM
|
MEC01-00395
| Pressure Test | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-00596
| Pressure Test | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 350 On 3/2/2001 12:25:12 PM
|