Inspections for the day of: Friday, March 2, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Ray
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-00352 Final2/28/20013/2/20013/2/2001 12:00:00 AMAPASS
###-####
ELE01-00057 Final3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/01/2001 at 13:05:38. Contact: ###-####.
ELE01-00662 Electrical Rough-In3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
###-####
ELE00-02716 Final3/1/20013/2/20013/2/2001 12:00:00 AMAFAIL
PJ ###-#### no access left note 3/2/2001 9:03:34 AM
ELE01-00665 Final3/2/20013/2/20013/2/2001 12:00:00 AMPFAIL
###-#### not ready 3/2/2001 12:22:34 PM
ELE01-00638 Temporary Service3/2/20013/2/20013/2/2001 12:00:00 AMPPASS
Added by Inspector: 404 On 3/2/2001 12:09:49 PM t/s ug n ok 3/2/2001 12:10:08 PM
ELE01-00665 Electrical Rough-In3/2/20013/2/20013/2/2001 12:00:00 AMPPASS
Added by Inspector: 404 On 3/2/2001 12:22:09 PM
ELE01-00605 Rough-In Permanent Service2/28/20013/2/20013/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/28/2001 at 09:09:15. Contact: ###-####. p/s ug n ok 3/3/2001 8:34:20 AM