Inspections for the day of: Friday, March 2, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00621 Pressure Test3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
pres test brian ###-####
MEC01-00457 Rough-in3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/01/2001 at 13:17:10. Contact: ###-####.
BLD00-02849 BLD-Final3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
alan ###-####
lc# 20306 issued 3/2/2001 10:06:50 AM
BLD00-02915 BLD-Final3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
Alan ###-####
lc# 20306 issued 3/2/2001 10:07:13 AM
BLD00-02916 BLD-Final3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
###-#### Alan
lc # 20306 issued 3/2/2001 10:07:33 AM
BLD01-00415 BLD-Footing3/5/20013/2/20013/2/2001 12:00:00 AMAPASS
done by 420 3/5/2001 11:17:14 AM
BLD00-03400 BLD-Energy code compliance2/27/20013/2/20013/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 02/27/2001 at 14:49:30. Contact: ###-####.
BLD00-02171 BLD-Final3/2/20013/2/20013/2/2001 12:00:00 AMPFAIL
###-####
c/n posted 3/2/2001 4:05:11 PM
MEC00-04130 Final3/2/20013/2/20013/2/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 03/02/2001 at 09:46:13. Contact: ###-####.
a/c not in yet and f.p. on other permit not done 3/2/2001 4:19:52 PM
BLD00-03674 BLD-Other3/2/20013/2/20013/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/02/2001 at 10:15:53. Contact: ###-####.by 420 3/2/2001 1:33:14 PM
BLD00-03155 BLD-Footing3/2/20013/2/20013/2/2001 12:00:00 AMPFAIL
###-####
interior ftgs. , need to redo per approved plans 3/2/2001 2:01:26 PM