Inspections for the day of: Friday, March 2, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03674 BLD-Other3/1/20013/2/20013/2/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 03/01/2001 at 09:06:50. Contact: ###-####.No approved plans on site. 3/2/2001 11:33:07 AM
BLD00-03683 BLD-Framing/Rough-in3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
Brian ###-####Ok to cover 3/2/2001 11:40:36 AM
MEC01-00218 Final3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/01/2001 at 14:08:25. Contact: ###-####.
MEC01-00587 Rough-in3/1/20013/2/20013/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/01/2001 at 14:10:39. Contact: ###-####.
BLD01-00378 BLD-Foundation3/2/20013/2/20013/2/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 03/02/2001 at 06:53:13. Contact: ###-####. Cancelled by contractor. 3/2/2001 8:23:31 AM
BLD01-00003 BLD-Framing/Rough-in3/2/20013/2/20013/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/02/2001 at 07:23:47. Contact: ###-####. Ok to insulate 3/2/2001 12:04:33 PM
BLD00-03325 BLD-Framing/Rough-in3/1/20013/2/20013/2/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/01/2001 at 20:33:11. Contact: ###-####. C/n posted--Truss T9X repair per eng. required, BCI ceiling joist above kitchen damaged needs replaced, or manufactures repair, Nail hangers throughout, i.e. T9,32,38,11,7 etc. Engineering required on trusses with have been notched--T9, Topplate straps needed on 2 ply M. Lam between family and hall, rotation blocks needed on trusses T26-29. 3/2/2001 11:26:38 AM
BLD00-02647 BLD-Other3/2/20013/2/20013/2/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 03/02/2001 at 04:18:44. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/02/2001 at 07:28:11.
BLD01-00002 BLD-Framing/Rough-in3/2/20013/2/20013/2/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/02/2001 at 07:24:42. Contact: ###-####. C/n issued--Grider per plans is 2 M. Lam--installed in I-joist-provide eng. or replace, Per plans at start of hallway should be 4 X 10 header, not installed, fireblock landing of stairs, G.Lam in garage need solid connections on both sides, Truss T9 per plans should be M.Lam provide eng. on truss, Truss package needed on site to complete framing inspection. 3/2/2001 2:37:07 PM
BLD00-03674 BLD-Framing/Rough-in3/2/20013/2/20013/2/2001 12:00:00 AMPPASS
Scheduled by Inspector: 420 On 3/2/2001 1:18:43 PM SHEAR--OK 3/2/2001 1:28:55 PM
BLD01-00013 BLD-Framing/Rough-in3/1/20013/2/20013/2/2001 12:00:00 AMPCANC
###-####----CANCEL PER KELLIE