BLD00-03674
| BLD-Other | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 09:06:50. Contact: ###-####.No approved plans on site. 3/2/2001 11:33:07 AM
|
BLD00-03683
| BLD-Framing/Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | PASS |
|
|
Brian ###-####Ok to cover 3/2/2001 11:40:36 AM
|
MEC01-00218
| Final | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 14:08:25. Contact: ###-####.
|
MEC01-00587
| Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 14:10:39. Contact: ###-####.
|
BLD01-00378
| BLD-Foundation | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 06:53:13. Contact: ###-####. Cancelled by contractor. 3/2/2001 8:23:31 AM
|
BLD01-00003
| BLD-Framing/Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 07:23:47. Contact: ###-####. Ok to insulate 3/2/2001 12:04:33 PM
|
BLD00-03325
| BLD-Framing/Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/01/2001 at 20:33:11. Contact: ###-####. C/n posted--Truss T9X repair per eng. required, BCI ceiling joist above kitchen damaged needs replaced, or manufactures repair, Nail hangers throughout, i.e. T9,32,38,11,7 etc. Engineering required on trusses with have been notched--T9, Topplate straps needed on 2 ply M. Lam between family and hall, rotation blocks needed on trusses T26-29. 3/2/2001 11:26:38 AM
|
BLD00-02647
| BLD-Other | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 04:18:44. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/02/2001 at 07:28:11.
|
BLD01-00002
| BLD-Framing/Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/02/2001 at 07:24:42. Contact: ###-####. C/n issued--Grider per plans is 2 M. Lam--installed in I-joist-provide eng. or replace, Per plans at start of hallway should be 4 X 10 header, not installed, fireblock landing of stairs, G.Lam in garage need solid connections on both sides, Truss T9 per plans should be M.Lam provide eng. on truss, Truss package needed on site to complete framing inspection. 3/2/2001 2:37:07 PM
|
BLD00-03674
| BLD-Framing/Rough-in | 3/2/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 3/2/2001 1:18:43 PM SHEAR--OK 3/2/2001 1:28:55 PM
|
BLD01-00013
| BLD-Framing/Rough-in | 3/1/2001 | 3/2/2001 | 3/2/2001 12:00:00 AM | P | CANC |
|
|
###-####----CANCEL PER KELLIE
|