ELE06-00165
| Conference | 3/2/2006 | 3/2/2006 | 3/2/2006 3:57:06 PM | P | PART |
|
|
Please call ahead 30 minutes; Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton this is not linked to a building permit yet. I informed the electrician that he would not get any more inspections unless it was linked to a permit.
|
ELE06-00698
| Electrical Rough-In | 3/2/2006 | 3/2/2006 | 3/2/2006 3:10:26 PM | P | PART |
|
|
uffer ground insp-- jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for concrete
|
ELE05-01631
| Electrical Rough-In | 3/2/2006 | 3/2/2006 | 3/2/2006 1:56:08 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/2/2006 at 7:57:44 AM. Contact: ###-####. 2nd and 3rd floor ceilings anop
|
ELE05-03827
| Electrical Rough-In | 3/2/2006 | 3/2/2006 | 3/2/2006 1:20:42 PM | P | NR |
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong Had conf. about 6 in free conductor, box-fill, 250.148, nail plates, and heat-trace cables.
|
ELE06-00721
| Electrical Rough-In | 3/1/2006 | 3/2/2006 | 3/2/2006 10:14:49 AM | A | PASS |
|
|
Mark -- reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
ELE06-00655
| Conference | 3/1/2006 | 3/2/2006 | 3/2/2006 9:43:34 AM | A | NR |
|
|
Sean; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong this is for 7 rooms
|
ELE06-00534
| Electrical Rough-In | 3/1/2006 | 3/2/2006 | 3/2/2006 9:16:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 3/1/2006 at 4:33:01 PM. Contact: ###-####. Underground pipe ok I called the contractor and gave him a heads up on the requirement for the equipotential bonding grid.
|
ELE06-00722
| Electrical Rough-In | 3/1/2006 | 3/2/2006 | 3/2/2006 9:10:03 AM | A | PART |
|
|
Renee -- walls; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong walls in 3 offices ANOP
|