Inspections for the day of: Thursday, March 2, 2006.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01409 FIRE-Final Inspection2/28/20063/2/20063/2/2006 4:30:42 PMPFAIL
See correction notice for items
FIR05-00425 INSP-Sprinkler Rough-in/Hydro3/1/20063/2/20063/2/2006 3:08:17 PMAPASS
200 LB hydro Test on 1st Flr dry System passed.
FIR05-00651 INSP-Final Inspection3/2/20063/2/20063/2/2006 3:07:35 PMPPASS
Permit finaled
FIR05-00779 INSP-Final Inspection3/2/20063/2/20063/2/2006 3:07:00 PMPPASS
permit finaled
FIR06-00076 INSP-Sprinkler Rough-in3/1/20063/2/20063/2/2006 11:24:31 AMAPASS
Sprinkler piping is ok to cover
FIR05-00814 INSP-Sprinkler Rough-in3/1/20063/2/20063/2/2006 11:24:06 AMAPASS
Sprinkler piping is ok to cover
BLD04-02937 FIRE-Conference3/1/20063/2/20063/2/2006 10:12:57 AMADONE
I had a conference with the superintendant and Treasure Valley Fire. Heads will not be required under the beam since it is only 10.5" wide but the sidewall head sprinkler deflectors exceed 6" from the beam/wall and will need to be relocated along both sides of the beams.
BLD05-01935 FIRE-Final Inspection3/1/20063/2/20063/2/2006 10:10:44 AMAPASS
Life safety finaled
BLD05-02937 FIRE-Final Inspection3/1/20063/2/20063/2/2006 9:20:42 AMAPASS
Life safety finaled