BLD06-01778
| BLD-Final | 3/1/2007 | 3/2/2007 | 3/2/2007 3:23:09 PM | P | PASS |
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD06-01778
| DOC - Permit Finaled | 3/2/2007 | 3/2/2007 | 3/2/2007 3:23:00 PM | P | PASS |
|
|
|
BLD07-00381
| BLD-Footing | 3/2/2007 | 3/2/2007 | 3/2/2007 2:21:11 PM | P | PASS |
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. footing at south side of house.
|
BLD06-02288
| BLD-Energy code compliance | 3/2/2007 | 3/2/2007 | 3/2/2007 1:54:55 PM | P | PASS |
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD07-00136
| BLD-Footing | 3/1/2007 | 3/2/2007 | 3/2/2007 1:42:44 PM | P | PART |
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip.
|
BLD05-02091
| BLD-Final | 2/23/2007 | 3/2/2007 | 3/2/2007 1:29:49 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/23/2007 at 12:58:46 PM. Contact: ###-####.
|
BLD05-02091
| DOC - Permit Finaled | 3/2/2007 | 3/2/2007 | 3/2/2007 1:29:36 PM | P | PASS |
|
|
final ok. Notified homeowner that another permit is required for the addition of the stairs. Also made note of this on inspection card.
|
BLD07-00500
| BLD-Footing | 3/1/2007 | 3/2/2007 | 3/2/2007 10:19:31 AM | A | CANC |
|
|
brian-- ###-#### call 1st for access. footing ok.
|
BLD06-03452
| BLD-Final | 3/1/2007 | 3/2/2007 | 3/2/2007 10:08:49 AM | A | PASS |
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Final ok. Will be ok for occ. once fire finals(exit light issues) No card to sign!!!!
|
BLD06-03413
| BLD-Framing/Rough-in | 3/1/2007 | 3/2/2007 | 3/2/2007 9:28:54 AM | A | PART |
|
|
zac; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul. Need truss engineering to complete framing inspection. Verified double layer 5/8 type x at soffit and can lights boxed out with double layer 5/8 typex. All penetrations were fire caulked.
|
BLD06-01790
| BLD-Footing | 3/2/2007 | 3/2/2007 | 3/2/2007 8:51:43 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 3/2/2007 at 5:54:30 AM. Contact: ###-####. wip.
|