ELE08-02905
| Final | 3/2/2009 | 3/2/2009 | 3/2/2009 3:36:12 PM | P | PART |
|
|
Please provide partial final inspection. Phone #: ###-#### Internet Inspection Request from: Spencer Mclean t/o card signed for all areas anop
|
ELE09-00260
| Permanent Service | 2/27/2009 | 3/2/2009 | 3/2/2009 1:44:17 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 7:16:05 AM. conference only ok
|
ELE09-00260
| Electrical Rough-In | 2/27/2009 | 3/2/2009 | 3/2/2009 1:43:28 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 2/27/2009 at 7:14:04 AM. Contact: ###-####. replace 2 gang boxes that are damaged, 110.3(A), shall not use 2 big conn. back of panel for cables 312.5, addoutlets for wall space, 210.52(A), nail plates and 11/4" 300.4, 250.48 grd metal boxes , 314.16 check box fill
|
ELE07-02945
| Final | 3/2/2009 | 3/2/2009 | 3/2/2009 12:03:54 PM | P | PASS |
|
|
wes Phone #: ###-#### survey 210.8 gfci all recepts final ok
|
ELE08-02167
| Permanent Service | 2/27/2009 | 3/2/2009 | 3/2/2009 9:51:05 AM | A | PASS |
|
|
andy Phone #: ###-#### needs 3/0 for GEC and bonds p/s u/g new ok
|
ELE09-00325
| Permanent Service | 2/27/2009 | 3/2/2009 | 3/2/2009 8:31:37 AM | A | PASS |
|
|
inspection to turn on service//Kim ###-#### p/s u/g rec. ok
|
ELE09-00325
| Final | 3/2/2009 | 3/2/2009 | 3/2/2009 8:31:10 AM | A | PASS |
|
|
inspection to turn on service//Kim ###-#### ok
|