BLD08-02182
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 4:26:27 PM | P | PASS |
|
|
jim Phone #: ###-####. 1st. floor, 2nd layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
BLD08-02183
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 4:25:45 PM | P | PASS |
|
|
jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
BLD08-02184
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 4:25:00 PM | P | PASS |
|
|
jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 type x rock both sides for 2hr. fire wall.
|
BLD08-02185
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 4:24:09 PM | P | PASS |
|
|
jim Phone #: ###-####. 1st. floor, 2nd. layer of 5/8 type x rock, both sides for 2hr. fire wall.
|
ESC08-00871
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 3:42:30 PM | P | PASS |
|
|
|
ESC08-00872
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 3:42:15 PM | P | PASS |
|
|
|
ESC08-00873
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 3:42:02 PM | P | PASS |
|
|
|
ESC08-00874
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 3:41:51 PM | P | PASS |
|
|
|
ESC08-00880
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 3:41:25 PM | P | PASS |
|
|
|
ESC08-00881
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 3:41:10 PM | P | PASS |
|
|
|
ESC08-00882
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 3:40:55 PM | P | PASS |
|
|
|
ESC08-00883
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 3:40:40 PM | P | PASS |
|
|
|
BLD08-02190
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:59:04 PM | P | CANC |
|
|
jim Phone #: ###-####
|
BLD08-02192
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:58:41 PM | P | CANC |
|
|
jim Phone #: ###-####
|
BLD08-02191
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:58:26 PM | P | CANC |
|
|
jim Phone #: ###-####
|
BLD08-02193
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:58:12 PM | P | CANC |
|
|
jim Phone #: ###-####
|
ESC08-00888
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 2:53:55 PM | P | PASS |
|
|
|
BLD08-02196
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:53:32 PM | P | PART |
|
|
jim Phone #: ###-####. 2nd. floor, 1st. layer, both sides type x rock for 2hr. fire wall.
|
ESC08-00886
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 2:50:49 PM | P | PASS |
|
|
|
BLD08-02195
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:50:33 PM | P | PASS |
|
|
jim Phone #: ###-####. 2nd. floor, 2nd. later, remaining side of 5/8 type x rock for 2hr. fire wall.
|
ESC08-00885
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 2:49:27 PM | P | PASS |
|
|
|
BLD08-02194
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:49:10 PM | P | PASS |
|
|
jim Phone #: ###-####. 2nd. floor, 2nd layer, remaining side of 5/8 type x rock. ok.
|
BLD08-02186
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:45:16 PM | P | PASS |
|
|
jim Phone #: ###-####. Both layers of 5/8 type x rock at overbuild area for 2hr. fire wall.
|
ESC08-00875
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 2:41:40 PM | P | PASS |
|
|
|
BLD08-02187
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:40:57 PM | P | PASS |
|
|
jim Phone #: ###-####. both layers of 5/8 type x rock at overbuild areas. ok.
|
ESC08-00877
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 2:39:38 PM | P | PASS |
|
|
|
BLD08-02188
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:39:20 PM | P | PART |
|
|
jim Phone #: ###-####. 2nd. floor, 1st. layer, one side only, type x 5/8 rock for 2hr. fire wall.
|
ESC08-00878
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 2:37:46 PM | P | PASS |
|
|
|
ESC08-00879
| BMP Violation | 3/2/2009 | 3/2/2009 | 3/2/2009 2:37:26 PM | P | PASS |
|
|
|
BLD08-02189
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 2:37:04 PM | P | PART |
|
|
jim Phone #: ###-####. 2nd floor, 1st. layer 5/8 typex, one side only for 2hr. fire wall.
|
BLD08-02395
| BLD-Footing | 3/2/2009 | 3/2/2009 | 3/2/2009 2:26:53 PM | P | PASS |
|
|
Ian Phone #: ###-####. Exterior column pad footings.
|
ESC08-00981
| Site Preparation | 3/2/2009 | 3/2/2009 | 3/2/2009 1:44:17 PM | P | PASS |
|
|
ESC permit signs have been posted at controlled enterance. Generak site conditions were good.
|
ESC08-00895
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 10:27:40 AM | A | PASS |
|
|
|
BLD08-02201
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 10:27:20 AM | A | PASS |
|
|
Attachment of 5/8 typex rock for 2hr. fire walls at overbuild areas. ok.
|
ESC08-00896
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 10:26:23 AM | A | PASS |
|
|
|
BLD08-02202
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 10:25:59 AM | A | PASS |
|
|
Attachment of 5/8 typex rock for 2hr. firewalls at overbuild areas.
|
ESC08-00897
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 10:25:07 AM | A | PASS |
|
|
|
BLD08-02203
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 10:24:44 AM | A | PASS |
|
|
Attacment of 5/8 typex rock for 2hr. walls at over build areas. ok.
|
ESC08-00898
| Random Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 10:23:52 AM | A | PASS |
|
|
|
BLD08-02204
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 10:23:05 AM | A | PASS |
|
|
Nailing for 5/8 typex rock on 2hr. walls at over build areas.ok.
|
BLD08-02195
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 10:13:32 AM | A | PASS |
|
|
jim Phone #: ###-####. 2nd. floor, 1st. layer, remaining side of 5/8 type x rock for 2hr. fire wall.
|
BLD08-02194
| BLD-Framing/Rough-in | 3/2/2009 | 3/2/2009 | 3/2/2009 10:12:26 AM | A | PASS |
|
|
jim Phone #: ###-####. 2nd. floor, 1st. layer remaining side of 5/8 type x rock for 2hr. wall.
|